Chapter 5
Transport
40001136 Geset 125
Version: 30.07.14
Page 27 of 57
GB
Instruction
Use the following procedure to transport the labeling system to its site of use.
Step
Procedure
1
Transport the labeling system to its site of use (within 3 m). The labeling
system is precisely positioned during installation by a Technician from the
Bluhm Weber Group.
Risk of injury! The straps are secured tightly and can fly back when they are
cut and cause injury.
2
Open, if available, the transport box (applied notes have to be observed!).
Remove any film and straps (if available).
3
Remove, if available, all transport securing devices from the rubber feet.
Fig. 5-2: Lift labeling system from pallet
4
Lift the labeling system with a suitable material handling equipment in shown
way from the pallet (applied notes have to be observed!).
5
Before startup, remove all transport securing devices (identified red tie
wrap).