Chapter 6
Installation and initial startup
40001136 Geset 125
Version: 30.07.14
Page 30 of 57
GB
Placing the labeling system
The labeling station has to be adapted to the customer’s conveying system in
position and height. The height of the system parts has to be ergonomically
designed according to the user’s requirements.
The installed position must allow sufficient access for users and service
technicians. In particular at all times, the mains switch / plug must be freely
accessible to disconnect the power supply
Make sure that all fasteners are sufficiently tight.
Observe all of the items under "Intended use" in the chapter “Safety regulations”.
Setting up the labeling system
Requirements
The labeling system is unpacked and prepared (see the chapter: "Transport" on
page 25) near the labeling site in the area of the installation site.
The base is solid, level and flat.
The labeling system and if applicable the turning plate must be completely installed.
The connections for the compressed air and electricity are close to the labeling site
(maximum distance of 1.5 m) as specified in the chapter: "Specifications“ on page
22).
Required equipment
Flat
wrench
Spirit
level
If applicable 2-3 persons
Instruction
Set a labeling system up as follows.
Step
Procedure
1
Move the labeling system to installation site. Move labelers without rolls
piece by piece diagonally. Consider all points for "Placing the labeling
system" on page 30.
2
Adjust the labeling system with an air lever by the adjustable feet
horizontally. (With rolls, the brakes have to be locked). See also “Adjust roll
conveyor”.
Connecting the labeling station
The labeling station requires electricity to work. For details see the chapter:
"Specifications" on page 22.