Maintenance protocol WP 54
Granudos 45/100 Touch
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Wartungsprotokolle WP\WDT WP 54 Wartungsprotokoll GR 45-100 Touch EN FO 00.doc
Key: F= at each granular filling; 1 = every month, 3 = every 3 months, 6 = every 6 months, etc.;
= work completed
Page 2 of 2
Activity
M
ain
te
nance
in
te
rval
in
m
onths
M
onth 1
M
ont
h 2
M
onth 3
M
onth 4
M
onth 5
M
onth 6
M
onth 7
M
onth 8
M
onth 9
M
onth 10
M
onth 11
M
onth 12
Comment / additional
work
6
Control
6.1
Check all inputs
12
6.2
Check all outputs
12
6.3
Check parameter settings and correct it if
required
12
7
Other work
7.1
Thoroughly clean the dosing system
1
7.2
Check dosing line for strength and wall
thickness
12
8
Maintenance work at each drum exchange
8.1
Clean the solution pipe for pollution
F
8.2
Clean dosing hopper from incrustations
F
8.3
Test chlorine and acid dosing
F
8.4
Take note of pumping noises
F
8.5
Check the system for tightness
F
8.6
Check the transparent hose of the dust
extraction (option) and clean it if necessary
F
Other comments:
Maintenance carried out and system checked for correct working:
Date:
Signature
Countersigned by operator:
Signature