Maintenance protocol WP 53
Granudos 45/100-CPR Touch XL
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Wartungsprotokolle WP\WDT WP 53 Wartungsprotokoll GR 45-100-CPR Touch XL EN FO 00.doc
Key: F= at each granular filling; 1 = every month, 3 = every 3 months, 6 = every 6 months, etc.;
= work completed
Page 2 of 2
Activity
M
ain
te
nance
in
te
rval
in
m
onths
M
onth 1
M
on
th
2
M
onth 3
M
onth 4
M
onth 5
M
onth 6
M
onth 7
M
onth 8
M
onth 9
M
onth 10
M
onth 11
M
onth 12
Comment / additional
work
6
Control
6.1
Check all inputs
12
6.2
Check all outputs
12
6.3
Check parameter settings and correct it if
required
12
7
Measuring cell block
7.1
Check and clean preliminary filter
12
7.2
DPD1 measurement, adjust free chlorine
12
7.3
pH measurement, adjust the pH electrode
12
7.4
Adjust the reference counter electrode
12
7.5
Chlorine electrode, replace seal set
12
7.6
Replace redox electrode, seal set
12
7.7
Replace flow controller, maintenance set
12
7.8
Replace the membrane of the pressure
control valve (2)
12
8
Other work
8.1
Thoroughly clean the dosing system
1
8.2
Check dosing line for strength and wall
thickness
12
9
Maintenance work at each drum exchange
9.1
Clean the solution pipe for pollution
F
9.2
Clean dosing hopper from incrustations
F
9.3
Test chlorine and acid dosing
F
9.4
Take note of pumping noises
F
9.5
Check the system for tightness
F
9.6
Check the transparent hose of the dust
extraction (option) and clean it if necessary
F
Other comments:
Maintenance carried out and system checked for correct working:
Date:
Signature
Countersigned by operator:
Signature