Granudos 45/100-CPR Touch XL + Touch + S5
Dosing unit
Index: 02
Date modified: 06/06/2019
OI No.: BA SW 003-02 Granudos 45-100 CPR Touch+Touch+S5-Dosiereinheit EN.docx Page 33 of 58
5
Commissioning
5.1
Commissioning - remarks
ATTENTION!
This chapter must also be observed every time recommissioning
occurs after an operating pause. Do not switch on the GRANUDOS
45/100 until the flushing tank has been filled.
The work described here may only be carried out by trained specialist personnel from a
specialist company. Prior to commissioning, the installed systems must be checked for proper
installation and leaks.
Please use the commissioning protocol from
Section 9.3.
for commissioning. The device is
delivered with defined factory settings. You can find the setting values in the operation data
sheet in
Section 9.4
ATTENTION!
During the installation of the piping and the electrical system, foreign
bodies may have fallen into the flushing unit, which could lead to
potential faults in the float valve or the suction pipe of the flow switch.
Remove foreign bodies!
5.2
Commissioning
Prior to starting the commissioning, ensure that the ball valves are connected to the
measuring cell block of the control unit (541).
5.2.1
Installation of peristaltic pump, roller support
The acid pump is installed on the right side of the UPRIGHT COLUMN of the GRANUDOS
45/100.
1.
Remove the clipped-in, transparent pump
cover and the blue lock washer. Pull the
hose bracket forward out of the guide in
the casing.
Figure 21,
Peristaltic pump
Lock washer
Hose set
Hose bracket
Pump housing
Pressure
connection
Suction connection