64
Part No. 920160 Rev A
February 1997
7.1.9.
Lift-to-Start Nozzle Boot Component Replacement
Note: After replacing nozzle boot components, refer to Section 4. to check for proper operation.
To replace the nozzle switch (see Figure 7-8.):
1. Disconnect the nozzle switch connector and, if necessary, cut the wire tie securing the
switch wiring to the dispenser.
2. Remove the nozzle boot by removing the (2) lower hex screws that secure the boot to the
dispenser; removing the nozzle boot collar, and loosening the (2) upper allen screws.
3. Remove the retainer clip that secures the switch to the back of the boot casting and remove
the switch.
4. Install the new switch and secure with a new retainer clip making sure that the right hand
edge of
the switch aligns with the right hand edge of the casting flat mounting surface as viewed
from the
back of the boot.
5. Re-install nozzle boot and connect nozzle switch connector securing wires with wire tie if
applicable.
To replace the magnet or spring (see Figure 7-8.):
6. Disconnect the nozzle switch connector and, if necessary, cut the wire tie securing the
switch wiring to the dispenser.
7. Remove the nozzle boot by removing the (2) lower hex screws that secure the boot to the
dispenser; removing the nozzle boot collar, and loosening the (2) upper allen screws.
8. Raise the nozzle hook to the up position.
9. Remove the (2) 1/4-20 x 7/8 hex screws under the nozzle hook.
10. Remove the (2) #10 x 3/4 plascrews that screw into the back of the filler guide from the
back of the nozzle boot.
11. Remove the filler guide assembly containing the nozzle hook from the nozzle boot.
12. Remove the spring by unclipping it from the back of the filler guide.
13. Replace the magnet and/or spring as necessary.
14. Reassemble nozzle boot in reverse order.
15. Re-install nozzle boot and connect nozzle switch connector securing wires with wire tie if
applicable.
Summary of Contents for Dresser Vista 1 Series
Page 1: ...1 Vista Series Blending and Non Blending Remote Dispensers SERVICE ...
Page 4: ...Part No 920160 Rev A February 1997 ...
Page 10: ...viii Part No 920160 Rev A February 1997 ...
Page 12: ...2 Part No 920160 Rev A February 1997 ...
Page 22: ...12 Part No 920160 Rev A February 1997 ...
Page 38: ...28 Part No 920160 Rev A February 1997 ...
Page 62: ...52 Part No 920160 Rev A February 1997 ...
Page 76: ...66 Part No 920160 Rev A February 1997 FIGURE 7 8 NOZZLE BOOT ASSEMBLY LIFT TO START ...
Page 77: ...67 February 1997 Part No 920160 Rev A FIGURE 7 9 NOZZLE BOOT ASSEMBLY PUSH TO START ...
Page 83: ...73 February 1997 Part No 920160 Rev A APPENDIX A TROUBLESHOOTING FLOWCHARTS ...
Page 110: ...100 Part No 920160 Rev A February 1997 ...
Page 111: ...101 February 1997 Part No 920160 Rev A APPENDIX B SERVICE INFORMATION AND CONNECTOR PIN OUTS ...
Page 134: ...124 Part No 920160 Rev A February 1997 ...
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......