
121
February 1997
Part No. 920160 Rev A
TABLE B-2. ISB ASSEMBLY CONNECTION PINOUTS FOR BLENDER (EXCEPT X1/V590 6 HOSE)
Connectors J2, J3 and J4 connect to wiring below the vapor barrier. Pinouts for
those connectors are listed below. Connectors J1, J5, J6, J9, J10 and J11 connect
to wiring within the pump head. Pinouts for those connectors are listed below.
J2 - Side 1
J3 - Side 2
J4 - Side 2
Pin
Signal
Pin
Signal
Pin
Signal
1
Open
1
Open
1
Common
2
Open
2
Nozzle Blend
2
Side 2 Pulse A Lo
3
Open
3
Pulse A2 Hi
3
Side 2 Pulse B Lo
4
Pulser Select Hi/Lo
4
Open
4
Side 1 Pulse A Lo
5
Open
5
Open
5
Side 1 Pulse B Lo
6
Nozzle Blend
6
Pulse B2 Hi
6
LED B2
7
Open
7
Open
7
LED A2
8
Pulse B1 High
8
Pulser Select Hi/Lo
8
LED B1
9
Pulse A1 High
9
Open
9
LED A1
J1 - Connects to CA/CR Board
J5 - Connects Solenoid Drive Bd.
J6 - For Future Use
Pin
Signal
Pin
Signal
Pin
Signal
1
Power (5 VDC)
1
Common
1
Side 1 Pulse A Hi
2
Power (5 VDC)
2
Side 1 Pulser Select
Hi/Lo
2
Side 1 Pulse A Lo
3
Open
3
Open
4
Open
4
Side 1 Nozzle Blend
5
Open
5
Open
6
Side 2 Pulser Select
Hi/Lo
6
Open
7
Open
7
Common
8
Open
8
Open
9
Common
9
Open
10
Open
10
Side 2 Nozzle Blend
11
Open
12
Open
13
Side 2 Pulse A Hi
14
Pulse A Lo
15
Open
J9 - Connects to Computer Base
J10 - Connects to Computer Base
J10 - Connects to Computer Base
Pin
Signal
Pin
Signal
Pin
Signal
1
Side 1 Nozzle
Single Product
1
Side 2 Nozzle
Single Product
1
Open
2
Common
2
Common
2
Open
3
Side 1 Pulse B Hi
3
Side 2 Pulse B Hi
3
Common
4
Side 1 LED B
4
Side 2 LED B
4
Open
5
Side 1 Pulse B Lo
5
Side 2 Pulse B Lo
5
Open
6
Side 1 Pulse A Hi
6
Side 2 Pulse A Hi
6
Common
7
Side 1 LED A
7
Side 2 LED A
8
Side 1 Nozzle Blend
8
Side 2 Nozzle Blend
9
Side 1 Pulse A Lo
9
Side 2 Pulse A Lo
Summary of Contents for Dresser Vista 1 Series
Page 1: ...1 Vista Series Blending and Non Blending Remote Dispensers SERVICE ...
Page 4: ...Part No 920160 Rev A February 1997 ...
Page 10: ...viii Part No 920160 Rev A February 1997 ...
Page 12: ...2 Part No 920160 Rev A February 1997 ...
Page 22: ...12 Part No 920160 Rev A February 1997 ...
Page 38: ...28 Part No 920160 Rev A February 1997 ...
Page 62: ...52 Part No 920160 Rev A February 1997 ...
Page 76: ...66 Part No 920160 Rev A February 1997 FIGURE 7 8 NOZZLE BOOT ASSEMBLY LIFT TO START ...
Page 77: ...67 February 1997 Part No 920160 Rev A FIGURE 7 9 NOZZLE BOOT ASSEMBLY PUSH TO START ...
Page 83: ...73 February 1997 Part No 920160 Rev A APPENDIX A TROUBLESHOOTING FLOWCHARTS ...
Page 110: ...100 Part No 920160 Rev A February 1997 ...
Page 111: ...101 February 1997 Part No 920160 Rev A APPENDIX B SERVICE INFORMATION AND CONNECTOR PIN OUTS ...
Page 134: ...124 Part No 920160 Rev A February 1997 ...
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......