72
Part No. 920160 Rev A
February 1997
7.2.6.
Check and Pressure Relief Valve Replacement,
continued
3. Remove the two (2) meter seal o-rings (the larger o-ring on the inlet and the
smaller o-ring on the outlet.
4. Remove the check pressure relief valve.
5. Install the new valve and replace the o-rings with new ones.
Note: Do not pinch the o-rings against the meter support.
6. Install the meter to the meter support using the four (4) bolts removed in
Step 1 above.
Summary of Contents for Dresser Vista 1 Series
Page 1: ...1 Vista Series Blending and Non Blending Remote Dispensers SERVICE ...
Page 4: ...Part No 920160 Rev A February 1997 ...
Page 10: ...viii Part No 920160 Rev A February 1997 ...
Page 12: ...2 Part No 920160 Rev A February 1997 ...
Page 22: ...12 Part No 920160 Rev A February 1997 ...
Page 38: ...28 Part No 920160 Rev A February 1997 ...
Page 62: ...52 Part No 920160 Rev A February 1997 ...
Page 76: ...66 Part No 920160 Rev A February 1997 FIGURE 7 8 NOZZLE BOOT ASSEMBLY LIFT TO START ...
Page 77: ...67 February 1997 Part No 920160 Rev A FIGURE 7 9 NOZZLE BOOT ASSEMBLY PUSH TO START ...
Page 83: ...73 February 1997 Part No 920160 Rev A APPENDIX A TROUBLESHOOTING FLOWCHARTS ...
Page 110: ...100 Part No 920160 Rev A February 1997 ...
Page 111: ...101 February 1997 Part No 920160 Rev A APPENDIX B SERVICE INFORMATION AND CONNECTOR PIN OUTS ...
Page 134: ...124 Part No 920160 Rev A February 1997 ...
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......