Job Specification Sheet
Job Number:
Model Number:
Water Hardness:
ppm or gpg
Capacity Per Unit:
Mineral Tank Size:
Diameter:
Height:
Salt Setting per Regeneration:
Regenerant Flow: Upflow Downflow
1. Meter Size:
A . 3/4" Paddle Wheel (Not Used)
B . 3/4" Turbine
C . 1" Paddle Wheel (Not Used)
D . 1" Turbine (Not Used)
E . 1-1/2" Electronic Inline Plastic Turbine (Not Used)
F . 1-1/2" Paddle Wheel (Not Used)
G . 2" Paddle Wheel (Not Used)
H . Generic_________Pulse Count__________Meter
Size__________
2. System Type:
A . System #4: 1 Tank, 1 Meter, Immediate, or Delayed Re-
generation
B . System #4: Time Clock
3. Timer Program Settings:
A . Backwash: ______________________________Minutes
B . Brine and Slow Rinse: _____________________Minutes
C . Rapid Rinse: _____________________________Minutes
D . Brine Tank Refill: _________________________Minutes
E . Pause Time: _____________________________Minutes
F . Second Backwash: _______________________Minutes
4. Drain Line Flow Control: ______________________gpm
5. Brine Line Flow Control: ______________________gpm
6. Injector Size#: ____________________________________
W110 LXT Downflow Softeners and SXT Filters
30