Lync WQ-AS
SECTION 3: OPERATION
L- OMM-007_A
•
5/6/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
11
of
42
• DO NOT install where system is exposed to harsh chemicals or may be subjected to
being struck by moving equipment, carts, mops or any other item that may cause
damage.
• DO NOT install the system outdoors. Keep system away from moisture, rain, and direct
sunlight. Ambient air temperature must remain below 122°F and relative humidity must
remain below 95%.
• The system MUST be installed in accordance with all applicable national, state and local
codes.
• Additional pretreatment may be necessary so that the feedwater conforms to the Feed
Water Specifications.
• The skid can be bolted down to the floor, if required.
3.3.
Plumbing and UV Connections
It is the responsibility of the end user to ensure that the installation is done according to local
codes and regulations. 2” slip-on PVC flanges in inlet and outlet provides the option for both
flange and slip connections.
1. Turn off water heater(s).
2. Turn off the main water supply valve to the pipe the system will be installed in.
3. Relieve pressure within plumbing system by opening then closing both the hot and cold
sides of a faucet until water ceases to dispense from faucet.
4. If water heater(s) is equipped with isolation valves, isolate the water heater(s) by closing
inlet and outlet valves.
5. If no isolation valve exists at system installation location, it is recommended to install an
isolation valve located within 10 feet of the system.
6. After finalizing the installation location, place the AquaSolve skid in installation location
and connect the feed water line to the inlet side of the AquaSolve skid.
7. Place the filter and UV skid next to AquaSolve skid. U
se the 2” gasket kit to connect the
outlet flange of AquaSolve skid to inlet flange of filter and UV skid.
8. Connect the outlet of filter and UV skid to treated water line plumbing.
WARNINGS!
Use gloves for quartz sleeve and lamp handling and installation. DO NOT touch the lamp
and quartz sleeve with bare hands. In cases that the lamp and sleeve are touched with bare
hands, use alcohol to clean them prior to installation.
9. Once the skids are installed and there will be no relocation, fully insert the quartz sleeve
into the reactor chamber of Lync UV system and install the O-ring over the quartz sleeve.
Press the O-ring down over the quartz sleeve until it is seated in the bevel of the stainless
steel reactor chamber's threaded port.
10. Install the quartz sleeve O-ring onto the visible end of the quartz sleeve. Screw the quartz
sleeve nut onto the quartz sleeve port thread and tighten hand tight.
11. Insert the UV lamp into the quartz sleeve. Gently press down on the glow cap and rotate
it clockwise until it locks in place on the mounting bracket.
12. Connect the lamp lead wire to the lamp.