Lync WQ-AS
SECTION 5: MAINTENANCE
L- OMM-007_A
•
5/6/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
41
of
42
immediately.
DO NOT energize a system with damp or wet electrical components.
1. Disconnect the power supply from the wall outlet.
2. Turn off the inlet valve and outlet isolation valves.
3. Disconnect the lamp lead wire from the glow cap electrical port. (A).
4. Rotate the glow cap counter clockwise to unlock it from the mounting bracket. (B).
5. Pull up on the glow cap to remove the lamp from the quartz sleeve. (C). If not replacing
the quartz sleeve proceed to step 11.
6. De-pressurize the system.
7. Grip the quartz sleeve nut with your hand and unscrew counter clockwise until it can be
lifted from the reactor chamber's threaded port. (D).
8. Remove the quartz sleeve from reactor chamber. (E).
9. Fully insert a new quartz sleeve into the reactor chamber and install the O-ring over the
quartz sleeve. Press the O-ring down over the quartz sleeve until it is seated in the bevel
of the stainless steel reactor chamber's threaded port.
10. Install the quartz sleeve nut onto the threaded port of the reactor chamber. Screw the nut
on clockwise and tighten hand tight.
11. Insert a new lamp into the quartz sleeve.
12. Gently press down on the glow cap and rotate it clockwise until it locks in place on the
mounting bracket.
13. Reconnect the lamp lead wire to the new lamp.
14. Turn on the inlet valve and check for leaks. Repair leaks as needed.
15. Restore power to the system.
16. Verify new bulb has 365 days remaining on the controller screen.
Immediately after replacement of the UV lamp, and /or quartz sleeve, follow the disinfection
procedure below.
Figure 6-2 Lamp and Quartz Sleeve Replacement
6.4.
Disinfection Procedure
NOTES:
B
A
C
D
E