6 - Maintenance - Install New Stitch-wire
Watkiss PowerSquare™224 User Manual
119
Close the PowerSquare
Feed the Stitch-wire
Step
Action
Information
1
Close the stitch wire cabinet.
2
Lower the PowerSquare main
deck.
3
Lower the clincher frame.
See “Lower the Clincher Frame”
on page 35.
4
Close the folder cover.
5
Close the connecting bridge cover.
Step
Action
Information
1
Touch START
2
Set the number of stitches to 6.
Touch
BASIC
>
STITCHES
.
3
Hand-feed or print an A4 or larger
size test job.
Enter the correct settings on the
touch screen, according to the size
and thickness of the job.
The stitch-wire loads automati-
cally during the stitch head cycle.
4
Check the stitch-wire is loaded.
Check that a stitch is made.
If needed, repeat the previous
step.
If a stitch is still not made, repeat
the procedure “Install the Stitch-
wire into the Stitch Head” on
page 118.
5
Reset the number of stitches on
the touch screen.
Summary of Contents for PowerSquare 224
Page 1: ...Watkiss PowerSquare 224 User Manual with Side Trimming option English Issue 5 June 2013...
Page 32: ...3 The User Interface The MENU Window 28 Watkiss PowerSquare 224 User Manual...
Page 58: ...4 Standard Tasks Operate the PowerSquare offline 54 Watkiss PowerSquare 224 User Manual...
Page 128: ...7 Specifications 124 Watkiss PowerSquare 224 User Manual...
Page 133: ......