IMPORTANT: Optimum sizing of the Reionator Pro Ultra

 will result in a regeneration every 3 to 6 days.

IMPORTANT: Do not use with water that is microbiologically unsafe or of 

unknown quality without adequate disinfection before or after the system.

PLUMBING CONNECTIONS

In virtually all circumstances, the Reionator Pro Ultra

 water system is at

-

tached to the main incoming water line in the home (hereafter referred to 
as the “main water line”) and conditions both the hot and the cold water 
lines—including lines to drinking water and ice machine lines. Be sure you 
are hooked up to the main water line and are feeding back into the main water 
line which branches off to all other lines. Refer to the Plumbing Connection 
Diagram (Figure 5, Page 5) for typical configuration.

IMPORTANT:

 Ensure that water entering the Reionator Pro Ultra

 is from 

the main cold water line, especially if the Reionator Pro Ultra

 is not the first 

appliance in the plumbing line. Hot water entering the REIONATOR

 may 

damage the resins and will void the warranty.

SYSTEM CAPACITY & REGENERATION SETTING

Refer to Table 1 to determine the volume of water that can be conditioned by 
the size of the system you have installed. This capacity may be different from 
ordinary softening systems, so please check the numbers.
If the valve is a 

timed valve

, it regenerates at a predetermined number of days.

To calculate the number of days, divide the total capacity of the system (optimum 
grains capacity divided by water hardness) by gallons per day  (# of people times 
75/gallons/person/day). For example, there are 4 people in a home and you are 
installing a 32,000 grain Reionator Pro Ultra

 (which has an optimum capacity 

of 16,080 according to  the chart).

As an example, say you’ve tested the water and it has a hardness  
of 7 grains/gallon.

Optimal grains capacity ÷ water hardness = total capacity.
No. of people x 75 gallons per day = gallons/day.
Total capacity ÷ gallons per day = No. of days to regenerate.
16,080 ÷ 7 = 2,300 gallons total capacity.
4 x 75 = 300 gallons per day water usage.
2300 - 300 gallons = 2000 gallons reserve capacity.
Reserve capacity = working capacity.
2000 ÷ 300 = 6.67 days before regeneration.
If the valve is a 

metered valve

, which measures actual water use, then using 

the above example, the setting would be about 2,000 gallons (allowing for a 
reserve capacity of approximately one day of water use).  2,300 gallons (total 
capacity) - 300 gallons per day (one day’s use) = 2,000 gallons.

IMPORTANT:

 As with any other appliance ALWAYS check your state and local 

regulations regarding plumbing and electrical connections and placement of the 
system before installation.

SPECIFICATIONS

*

Single Tank Systems

MODEL

NUMBER

GRAINS

 CAPACITY

MAXIMUM

RECOMMENDED

FLOW RATE (gpm)

CONTINUOUS FLOW 

RATE (gpm)

@15 PSID

RESIN

TANK

BRINE

TANK

SYSTEM

HEIGHT

SALT 

STORAGE

APPROX.

WEIGHT

RXU13

39,000

11.0

15

13” X 54”

18” X 33”

62”

200 lbs

175 lbs

* Indicates factory specifications, which are not tested or validated by IAPMO R&T.

 

   Refer to Performance Data Sheet on Page 18 for validated specifications.

Operating Pressure Range = 20 to 125psi

We recommend that the system regenerate no more than two times per day per resin tank.

Installation Guide

2

Summary of Contents for REIONATOR PRO ULTRA RXU13

Page 1: ...NER with Triton Electronic Control Valve INSTALLATION AND SERVICE MANUAL IAPMO R T certified to NSF ANSI Standards 42 and 44 for meeting or exceeding industry standards of aesthetic chlorine reduction...

Page 2: ...ness by gallons per day of people times 75 gallons person day For example there are 4 people in a home and you are installing a 32 000 grain Reionator Pro Ultra which has an optimum capacity of 16 080...

Page 3: ...rain and direct sunlight IMPORTANT Damage to the Reionator Pro Ultra as a result of exposure to the elements without the use of a weather cover will not be covered under the limited lifetime warranty...

Page 4: ...NECTION Install 1 2 I D plastic tubing from the hose barb located on the right side of the main control valve to an open drain Do not connect the drain directly to a sewer as this would violate sanita...

Page 5: ...nimum run between Reionator Pro unit and water heater hot cold hot water heater typical plumbing installation Triton Bypass Valve Important Brass or Plastic yoke assembly not shown is required to conn...

Page 6: ...ll 1 2 I D tubing not provided to the brine tank overflow fitting located on the side of the tank and run it to the drain The brine overflow is provided in case a situation should arise causing too mu...

Page 7: ...e tank Position mark on air check valve at same level as surface of salt grating to floor drain salt grating air check valve positioning mark brine well cap to aircheck overflow elbow brine well Figur...

Page 8: ...nd release the Set Time button The screen should change to the Set Time screen and the hour should flash Press and release either the or buttons until the desired hour of the day is reached AM or PM w...

Page 9: ...rs should stop flashing and the minutes should begin flashing Press either the or buttons to change the minutes as shown in Figure 9b When you ve finished setting the time press and release the Set Ti...

Page 10: ...e bypass has straight fittings The Triton uses no traditional fasteners e g screws instead clips threaded caps and nuts and snap type latches are used Caps and nuts only need to be firmly hand tighten...

Page 11: ...11 Bypass Valve Operation...

Page 12: ...e piston into the Brine Dn position Check the brine line for leaks or suction You should hear the valve drawing brine Continue to skip cycles by pressing and releasing the REGEN button wait for the mo...

Page 13: ...rn to service In step 5 you will set the valve to Regen Today so that it will regen tonight at the specified time If there is any residual chlorine it should be removed tonight Step 4 Make sure that t...

Page 14: ...a comes pre set from the factory to perform as a typical softener valve However there are certain settings that are specific to the customer s water situation that cannot be set at the factory This se...

Page 15: ...rom the Set HARDNESS screen press the NEXT button You should now see the Set REGEN DAY screen shown above Simply press the or button to change the day override IMPORTANT This screen is used to set the...

Page 16: ...ne flow control if plugged E Hot water tank hardness E Repeated flushings of the hot water tank is required F Leak at distributor tube F Make sure distributor tube is not cracked and check O ring and...

Page 17: ...oreign material and check control in various regeneration positions B Internal control leak B Replace seals and or piston assembly C Control valve jammed in brine or C Replace seals and or piston back...

Page 18: ...SAFE OR OF UNKNOWN QUALITY WITHOUT ADEQUATE DISINFECTION BEFORE AND OR AFTER THE SYSTEM USAGE OF THE REIONATOR PRO ULTRA IN A MANNER OTHER THAN PRESCRIBED IN THE MANUFACTURER S WARRANTY WILL VOID THE...

Page 19: ...PTION PART NUMBER Resin Tank 13 x 54 09 03 1354BLK Xmid Brine Tank 09 04 1833BKC Brine Grid 18 09 04 119 Brine Well Assembly 3 5 X 30 09 04 240 Brine Overflow Elbow 07 05 004 Triton Control Valve 13 V...

Page 20: ...06 01 020 10 03 2017 800 FREEPORT PARKWAY 150 COPPELL TX 75019 888 254 8412 www watertech com...