background image

13

Step 3: 

To ensure sanitary conditions in the mineral and brine tanks, place 1.5 ounces common household bleach into the brine tank. Press and 
hold the REGEN button for 3 seconds to move the control valve into “1st Backwash” position. Once the motor stops, press and hold the 
REGEN button to move the control valve to the “Brine Dn” position. This cycle normally takes about 60 minutes, however 10 minutes 
should be sufficient to pull the chlorine from the brine tank. After 10 minutes, press and hold the REGEN button to move the control valve 
to the “2nd Backwash” position. Let the valve complete this cycle and also the “Brine Rinse” and “Brine Fill” cycles which will come 
next. Once the valve has completed the “Brine Fill” cycle it will automatically return to service. In step 5 you will set the valve to “Regen 
Today” so that it will regen tonight at the specified time. If there is any residual chlorine, it should be removed tonight.

Step 4:

  Make sure that the bypass valve is completely set in the “Normal Operation” position. Let the water in the taps of the building run for 

several minutes to purge the unconditioned water out of the pipes. After several minutes, take a water sample and test for hardness 
from the running tap. If a hardness test reads “soft” water then the installation is correct

Step 5:

  Press and release the REGEN button. You should see “Regen Today” appear on the LCD screen. This will instruct the control valve to 

regenerate tonight at the specified time (usually after everyone is asleep).

Step 6:

  Drain hot water heater and let it refill with conditioned water.  We suggest draining the hot water by turning on the hot water taps in 

the house. We recommend doing this just prior to bedtime.

 

Summary of Contents for REIONATOR PRO ULTRA RXU13

Page 1: ...NER with Triton Electronic Control Valve INSTALLATION AND SERVICE MANUAL IAPMO R T certified to NSF ANSI Standards 42 and 44 for meeting or exceeding industry standards of aesthetic chlorine reduction...

Page 2: ...ness by gallons per day of people times 75 gallons person day For example there are 4 people in a home and you are installing a 32 000 grain Reionator Pro Ultra which has an optimum capacity of 16 080...

Page 3: ...rain and direct sunlight IMPORTANT Damage to the Reionator Pro Ultra as a result of exposure to the elements without the use of a weather cover will not be covered under the limited lifetime warranty...

Page 4: ...NECTION Install 1 2 I D plastic tubing from the hose barb located on the right side of the main control valve to an open drain Do not connect the drain directly to a sewer as this would violate sanita...

Page 5: ...nimum run between Reionator Pro unit and water heater hot cold hot water heater typical plumbing installation Triton Bypass Valve Important Brass or Plastic yoke assembly not shown is required to conn...

Page 6: ...ll 1 2 I D tubing not provided to the brine tank overflow fitting located on the side of the tank and run it to the drain The brine overflow is provided in case a situation should arise causing too mu...

Page 7: ...e tank Position mark on air check valve at same level as surface of salt grating to floor drain salt grating air check valve positioning mark brine well cap to aircheck overflow elbow brine well Figur...

Page 8: ...nd release the Set Time button The screen should change to the Set Time screen and the hour should flash Press and release either the or buttons until the desired hour of the day is reached AM or PM w...

Page 9: ...rs should stop flashing and the minutes should begin flashing Press either the or buttons to change the minutes as shown in Figure 9b When you ve finished setting the time press and release the Set Ti...

Page 10: ...e bypass has straight fittings The Triton uses no traditional fasteners e g screws instead clips threaded caps and nuts and snap type latches are used Caps and nuts only need to be firmly hand tighten...

Page 11: ...11 Bypass Valve Operation...

Page 12: ...e piston into the Brine Dn position Check the brine line for leaks or suction You should hear the valve drawing brine Continue to skip cycles by pressing and releasing the REGEN button wait for the mo...

Page 13: ...rn to service In step 5 you will set the valve to Regen Today so that it will regen tonight at the specified time If there is any residual chlorine it should be removed tonight Step 4 Make sure that t...

Page 14: ...a comes pre set from the factory to perform as a typical softener valve However there are certain settings that are specific to the customer s water situation that cannot be set at the factory This se...

Page 15: ...rom the Set HARDNESS screen press the NEXT button You should now see the Set REGEN DAY screen shown above Simply press the or button to change the day override IMPORTANT This screen is used to set the...

Page 16: ...ne flow control if plugged E Hot water tank hardness E Repeated flushings of the hot water tank is required F Leak at distributor tube F Make sure distributor tube is not cracked and check O ring and...

Page 17: ...oreign material and check control in various regeneration positions B Internal control leak B Replace seals and or piston assembly C Control valve jammed in brine or C Replace seals and or piston back...

Page 18: ...SAFE OR OF UNKNOWN QUALITY WITHOUT ADEQUATE DISINFECTION BEFORE AND OR AFTER THE SYSTEM USAGE OF THE REIONATOR PRO ULTRA IN A MANNER OTHER THAN PRESCRIBED IN THE MANUFACTURER S WARRANTY WILL VOID THE...

Page 19: ...PTION PART NUMBER Resin Tank 13 x 54 09 03 1354BLK Xmid Brine Tank 09 04 1833BKC Brine Grid 18 09 04 119 Brine Well Assembly 3 5 X 30 09 04 240 Brine Overflow Elbow 07 05 004 Triton Control Valve 13 V...

Page 20: ...06 01 020 10 03 2017 800 FREEPORT PARKWAY 150 COPPELL TX 75019 888 254 8412 www watertech com...

Reviews: