Cleaning the ion block assembly
5-41
8. Using the O-ring removal kit, carefully remove the isolation valve
O-ring (see
9. If the isolation valve O-ring shows signs of deterioration or damage,
dispose of it in accordance with local environmental regulations.
10. Using the combined 2.5-mm Allen wrench and cone extraction tool,
loosen the captive screw that secures the PEEK terminal block.
11. Using the needle-nose pliers, grasp the PEEK terminal block and
partially lift it out of the ion block.
Warning:
The isolation valve O-ring can be contaminated
with biohazardous and/or toxic materials. Dispose of it
according to local environmental regulations.
Caution:
To avoid damaging the heater cartridge assembly wires,
do not bend or twist them when removing the assembly from the
ion block.
PEEK terminal
block securing
screw
Summary of Contents for SYNAPT G2
Page 18: ...xviii Table of Contents...
Page 46: ...2 8 Starting Up and Shutting Down the Mass Spectrometer...
Page 66: ...3 20 Configuring the LockSpray Source...
Page 228: ...B 24 External Connections 7 Click Next Result The software installs 8 Click Finish...
Page 232: ...C 4 Materials of construction and compliant solvents...