Installation
5
6
7
0274
0950
1133
Mechanical installation
•
Before mounting the machine place wide steel
shims on the concrete foundation over the
bolts.
•
Lift the machine and lower it in position. Never
use the door or the door handle to lift or lower
the machine since this can damage the door
and door interlock.
•
Check that the machine is level front-to-rear
and side-to-side and standing firmly on the six
supporting points. Spacing washers must be
mounted if one or more of these points is not
resting against the floor/foundation.
•
Place flat washers over the foundation bolts
and secure the machine in position by tighte-
ning the self-locking nuts. See illustration 7
below.
•
Check and tighten the nuts every week for the
first month to compensate for any setting of
the foundation.
NOTE
If the side panels of the washer vibrate
during extraction remove the shipping
security which connects the top of the
cylinder to the upper section of the back
panel. This is used to prevent shipping
damage but has no function after the
machine is installed.
Fig.
5
6
steel
shim
selflocking
nut
flat washer
Fig.
6
Fig.
7
Summary of Contents for Selecta S28/125
Page 2: ......
Page 6: ......
Page 35: ...28 Mechanical and electrical design 1791 46 S28 185 208 240 V 60 Hz single phase...
Page 55: ...Fault finding Circuit Board...
Page 76: ......