55
warmhaus.com
SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly
serviced and maintained, in line with manufacturers’ instructions, and that
the appropriate service / interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have
carried out the service as described in the manufacturers’ instructions.
Always use the manufacturers’ specified spare parts.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate CO ppm
CO²
%
CO/CO²
Min rate CO ppm
CO²
%
CO/CO²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature: