background image

45

warmhaus.com

Turn off any other gas appliances connected to the gas meter to which 

the boiler is directly connected, Turn the boiler to maximum (see Service 

Mode) and operate for approximately 10 mins to allow the appliance to 

warm up and for any expansion of the burner to take place (if you have 

issues with excess temperature in the boiler running the DHW outlet with a 

minimum of 12l/min will assist with this issue (for combi boilers)).
Carry out a gas rate and ensure you follow the gas rating procedure as 

per the current Domestic Gas Safety legislation and requirements, once 

the gas rate is complete instruct the boiler to exit the Service Mode (see 

Service Mode).
Please refer to the technical table in the boiler manual to confirm the 

correct gas rate.
Ensure you retain the details of the gas rate to record them in the 

appropriate section of the Benchmark   documentation.
For smart meter installations please follow the instructions from the meter 

supplier for the correct usage of the display menu.

GAS RATE INFO

 

CAUTION

It is very important to ensure the boiler gas rate is    correct as this will 

determine how much gas is being burnt and how much heat is released 

from the boiler.
This is important with regards the efficiency and safe operation of the 

boiler.
When carrying out a gas rate, if you are using an App based calculator to 

determine the figures please ensure it is a valid calculator and is from a 

trusted source.
Warmhaus advise you check the data shown on the calculator routinely by 

carrying out a gas rate as per the current gas working practices manually 

and compare the figures.
If the App calculator is proven to be accurate and can be used as a trusted 

source then Warmhaus will be happy to accept the results given by this 

method.
When comparing the gas rate data from your test please use the DHW 

figures on the data badge or the stated gas rate in the technical data chart 

is this manual as the reference and not the CH data.
For any additional technical data regarding this test please call Warmhaus 

technical on 020 7164 6233

4.10. CIRCULATION PUMP ROTATION

 

CAUTION

Please manually rotate the impeller on the circulating pump inside the 

boiler before turning on the power supply to the boiler to ensure pump is 

not seized.

Display Functions in Standby

Setting Flow Temperature

When the system boiler is started, a flame modulation symbol is seen at 

the middle section of the screen. At that position, you can increase and 

decrease  the  temperature  with  CH  temperature  adjustment  buttons        

between 35 – 80 °C. The screen lights up when buttons are pressed and °C 

symbol flashes besides the CH temperature value.

4.11. SETTING UP THE EXTERNAL CONTROLS

Ensure all wiring for the external controls are connected to the boiler and 

the external control as per the manufacturer’s instructions and ensure that 

the settings are adjusted to the customer’s requirements.

B:

 REMOVE THE BRIDGE WIRE FROM THE ROOM THERMOSTAT / TIMER 

TERMINAL B WHEN THE TIMER OR OPENTHERM ROOM THERMOSTAT 

CONNECTED THE BOILER!

Summary of Contents for Minerwa 25 System IE

Page 1: ...MinerWa 25 System IE CONDENSING SYSTEM BOILER INSTALLATION SERVICE MANUAL...

Page 2: ...2 warmhaus com...

Page 3: ...explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales All installati...

Page 4: ......

Page 5: ...N SPLAN WIRING DIAGRAM 28 3 16 4 EXTERNAL CONTROL CONNECTION YPLAN WIRING DIAGRAM 29 4 COMMISSIONING 30 4 1 DISPLAY FUNCTION 30 4 1 1 SET TRANSPARENT PARAMETERS MENU TSP 30 4 1 2 PARAMETERS 31 4 1 3 P...

Page 6: ...of all statutory regulations These appliances are CE certified for safety and performance and therefore must in no way be altered or have any device or controls fitted unless it is approved in this do...

Page 7: ...to your user manual and arrange professional assistance where advised Before operating your Warmhaus boiler please read the instructions supplied with the boiler For installation of this appliance in...

Page 8: ...Combustion Specification G20 G31 Gas Rate Max m h 2 38 0 92 Gas Rate Min m h 0 37 0 11 C02 Maximum Power AUTO CALIBRATION ONLY 8 7 9 2 10 10 5 C02 Minimum Power AUTO CALIBRATION ONLY 8 6 9 4 10 10 5...

Page 9: ...is can be an exception for a single story open plan dwelling where the living area is more than 70 of the useable floor area in this case this zone can be controlled and treated as a single zone Indiv...

Page 10: ..._____ Name ___________________________________ Address ___________________________________ ___________________________________ Eircode ___________________________________ Phone Number ________________...

Page 11: ...ny controls on the boiler All roof space installations should comply to BS5410 part 1 roof space installations Storage Do not store any flammable materials around the location of the boiler or chemica...

Page 12: ...Debris in the existing heating system can cause damage to the boiler unit and cause efficiency issues and even void the appliance warranty if the correct cleaning has not been carried out 2 7 ELECTRIC...

Page 13: ...r external corner or to a boundary alongside the terminal 300 I Above ground roof or balcony level 300 J From a surface or a boundary facing terminal 600 K From a terminal facing the terminal 1200 L F...

Page 14: ...ling of the fixing holes for the mounting bracket can also be done as per the guidance on the wall mounting template The template also displays the pipe centers and correct pipe work layout for the co...

Page 15: ...es and a connector pipe for the installer to connect to the boiler unit The hardware pack supplied is Flow 22 mm isolation valve compression 2 x Copper end feed adaptor 22 mm to 3 4 Gas 22 mm isolatio...

Page 16: ...a label if the inhibitor manufacturer supplied this or with a suitable method so that the installation date can be monitored for service Inhibitor levels should be monitored and checked on service ma...

Page 17: ...d be used with dowels 60 100 mm Concentric ue systems information Only approved Warmhaus flue systems can be connected to our appliance and no other flues have been tested or approved to work with any...

Page 18: ...CAUTION For security purposes system boiler suction discharge flue should not block even temporarily 3 11 INSTALLATION WITH VERTICAL FLUE SETS 60 100 MM Your system boiler can also be vertically conn...

Page 19: ...tion and air supply circuits shall fit inside a square of 50 cm and that the distance between the planes of the two orifices shall be less than 50 cm Detail A Waste gas vertical outlet chimney set Roo...

Page 20: ...1 660 600014 White 153 11 660 600117 Grey 60 100 Condensing Flue Extension L 1000 mm 153 11 660 600111 Black 153 11 660 600015 White 153 11 660 600118 Grey 60 100 Condensing Flue Extension L 2000 mm 1...

Page 21: ...Gas Installations 2 If the terminal discharges onto a pathway or passageway check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway 3 If a termi...

Page 22: ...eter 19mm 9 Pipe size transition 10 Minimum internal diameter 30mm 11 Water Weatherproof insulation 12 Drain cover leaf guard INTERNAL CONDENSATE PIPE DISCHARGE TERMINATION External termination to rai...

Page 23: ...on of a condensate pump typical method 1 Boiler 2 Visible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with integral overflow 5 Open end of condensat...

Page 24: ...Minimum internal diameter 19 mm 9 Pipe size transition point 10 Minimum internal diameter 30mm 11 Water weather proof insulation EXTERNAL CONNECTIONS External termination to rainwater downpipe NB only...

Page 25: ...n point 9 Minimum internal diameter 30 mm 10 Water weatherproof insulation 11 Fit drain cover leaf guard INTERNAL CONDENSATE PIPE DISCHARGE TERMINATION Example of a purpose made soakaway 1 Condensate...

Page 26: ...26 warmhaus com 3 16 MINERWA 25 SYSTEM IE WIRING DIAGRAM WIRING DIAGRAM RISK OF ELECTRIC SHOCK...

Page 27: ...lied with the boiler To connect your low voltage external control remove the green link wire and connect your two external control cables to the two green wires on the terminal connector 3 16 2 Extern...

Page 28: ...mains voltage connected to the room stat connections on our terminal connector therefore if the system configuration is an SPLAN please follow the above image to ensure that 240v voltage will not be a...

Page 29: ...nd must not have voltage connected to the room stat position on our terminal connector therefore if the system configuration is a YPLAN you must connect the relay supplied with our boiler as per the a...

Page 30: ...ue 0 Attention Do not change this parameter 4 From this moment toggle CH to increase or CH to decrease any parameter aimed to be changed 5 Ones you reach the parameter aimed to be changed Change the p...

Page 31: ...ter 2 Flow meter AND W O DHW Sensor Algorithm P04 KT coefficient for regulation with EXT probe 4 90 30 P05 Anti fast cycles time value 1 1 minute 0 10 min 3 P06 Maximum CH power 0 100 N A P07 Ignition...

Page 32: ...hould be SET on the TsP 1 Comfort if this adjusted on TsP then Pre Heat Function is will not work 2 Disable P19 Exhaust measurement configuration 0 1 1 0 Flue thermostad 1 Flue NTC P20 Minimum value f...

Page 33: ...value 1 10 seconds if Preheat adjusted time value 2 0 60 sec x 10 12 P41 Sanitary modulation with Fluxmeter 0 1 1 0 Disconnected 1 Connected P42 DHW Preheat function configuration Please check P18 fi...

Page 34: ...Automatic refill valve 5 Not used 6 Recirculation pump 7 Zone valve with OT 8 Not used P52 Automatic water refill 0 1 0 0 Not present 1 Present P53 Parameter perc combustion 0 30 N A P54 Fluxmeter val...

Page 35: ...flow regulator present 2 4 Not used P67 Button configuration selection 0 1 0 0 Push button only 1 Turning knobes with push button P68 B P paramter 1 DO NOT CHANGE 0 255 63 P69 B P paramter 1 DO NOT C...

Page 36: ...l Technical data Mark s of conformity Procedure service mode MinerWa 25 System IE granted by Warmhaus R D Pos No Operation Description GB 0 Attention This procedure must be applied by authorised perso...

Page 37: ...ve the FGA the boiler will now make some tests and when it is ready for adjustment it will display P01 and a setpoint number Step 5 Again as above insert your FGA and check the readings to see if they...

Page 38: ...ng this time 7 The boiler will be stable within 3 5 minutes after P0 AND set flame correction is displayed on the screen P0 MINIMUM POWER To increase the CO2 value press the DHW button OR to decrease...

Page 39: ...layed on the screen P0 MINIMUM POWER To increase the CO2 value press the DHW button OR to decrease the CO2 value press the DHW button Attention Calibration range is between 3 and 3 7 After adjusting t...

Page 40: ...interrrupt Make sure boiler frontal casing is totally closed and sealing of the boiler body is secured during calibration 3 Attention If the OT thermostat is connected to the boiler before start the E...

Page 41: ...d OFF for 10 cycles ON Time 20sec OFF time 15sec After each switch OFF the counting value will be decreased by 1 14 When 0 is reached the function stops and the boiler exit from the ESF automatically...

Page 42: ...heck following Informations Last 10 Failure Error codes Information by reading some real values Counters Menu 4 From AL 0 to AL9 show last 10 Error code that boiler had previously Error code shown aft...

Page 43: ...bove Until OFF symbol shown on the screen 4 The boiler should be OFF 5 Push the RESET and DHW button simultaneously 6 Wait until the approval circle complete on the LCD and release buttons 7 The Air w...

Page 44: ...t the boiler into service mode please see page for instructions Remove the air inlet test point on the flue elbow or adaptor and insert your FGA the O2 CO2 and CO reading whilst the boiler is in opera...

Page 45: ...is from a trusted source Warmhaus advise you check the data shown on the calculator routinely by carrying out a gas rate as per the current gas working practices manually and compare the figures If t...

Page 46: ...ncrease reach the Parameter P02 aimed to be changed 5 Ones you reach the parameter aimed to be changed change the parameter VALUE by using the DHW and set P02 1 6 Push the RESET button to save the adj...

Page 47: ...le CH to increase reach the Parameter P02 aimed to be changed 5 Ones you reach the parameter aimed to be changed change the parameter VALUE by using the DHW and set P02 0 6 Push the RESET button to sa...

Page 48: ...ance is maintaining maximum power output and allow the readings on the analyzer to stabilize Readings should be CO less than 300 ppm CO CO2 ratio 0 004 or below Yes Boiler is operating correctly and w...

Page 49: ...le Combustion Check Ensure the correct fitting of the front casing 5 3 DRAINING THE BOILER CH CIRCUIT CAUTION Isolate the boiler from the electric supply isolation point Carry out electrical safe isol...

Page 50: ...the 2 screws holding the ignition electrode to the combustion chamber 5 Remove the electrode 6 Fit the new ignition electrode using a new gasket 7 Ensure the correct distances are maintained between t...

Page 51: ...parameter list 6 Check P15 value on the parameter list 7 Check P22 value on the parameter list 8 Check P44 value on the parameter list 9 Check P46 value on the parameter list 10 If you wish to use th...

Page 52: ...pull the PRV forward away from the boiler to remove 5 Ensure the new PRV sealing O ring is free from damage and is suitably greased 6 Push the PRV into the hydraulic housing and ensure it correctly lo...

Page 53: ...place NTC 4 Check cabling and connectors between double NTC and board 5 Reset Restart boiler E 06 No ignition Boiler does not work E06 error code flashing on the screen Gas supply failure 1 RESET boil...

Page 54: ...be open 4 RESET boiler and check if ok 6 Check Pump operation to check if the pump circulation through the heat exchanger is sufficient 7 Check intermittent contacts on harness carefully check pump a...

Page 55: ...in accordance with manufacturers instructions and readings are correct yes Gas rate m3 h OR ft3 h Were parts fitted delete as appropriate Yes No Parts fitted System inhibitor concentration has been ch...

Page 56: ...___________________________________ Account No ___________________________________ Phone Number ___________________________________ Email ___________________________________ RGI Number ______________...

Page 57: ......

Page 58: ...IES If you smell gas call Gas Networks Ireland 24 hour emergency line immediately or 1850 20 50 50 Don t assume somebody else has reported the smell Carbon monoxide information For further Information...

Reviews: