Rev. 1.1
Assembly Instructions - Dosing Valve Station 9741970.0x
Page 15 of 31
Walther Systemtechnik GmbH
– D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de
6 Taking out of Service
6.1 Short Interruption
A clean-spraying should be performed for short interruptions (15 min or more)
IMPORTANT
Please observe the maintenance instructions!
6.2 Long-term Interruption
The following has to be observed for a long-term interruption of the device:
No pressure shall be left in system (check displays).
IMPORTANT
Please observe the maintenance instructions
!
6.3 Shutdown of Device
The following has to be observed for a final shutdown of the device:
Disconnect the main power plug.
No pressure shall be left in the system (check displays).
Dispose properly of grease/oil.
Clean dosing valve with special thinner
CAUTION
Danger of accidents and environmental pollution. Do not spill grease / oil. Dispose
properly of grease / oil (hazardous waste).
IMPORTANT
Please observe the maintenance instructions!