45
VERSION 01/2020
ORDER NUMBER DOC2397091
SprayPackE
6.5
CONNECTION DIAGRAM IN THE RACK
As a minimum development stage, an MCE with 1-10 EPG S2 can be connected.
The CAN bus must be closed at the start and end.
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
B
A
A
A
B
B
P_03733
P_02568
Mains input terminal
Compressed air
connection
at least 1"
Air diffuser
Close on last device with terminating plug
(order no. 2321402)
Summary of Contents for SprayPackE
Page 1: ...SprayPackE Version 01 2020...
Page 2: ......
Page 73: ...73...
Page 74: ...74...
Page 75: ......