CONCRETE POWER TROWEL
2
Table of Contents
Acknowledgment ....................................................................2
Foreword .................................................................................3
Safety Alerts ............................................................................4
A Word to the User/Operator ................................................5
Follow a Safety Program........................................................6
Prepare for Safe Operation ..................................................10
Start Safely ............................................................................17
Operate Safely ......................................................................19
Shut Down Safely .................................................................21
Perform Maintenance Safely ...............................................22
Final Word to the User .........................................................35
Acknowledgment
We wish to thank the members of the Association of Equipment Manufacturers for their invaluable
contributions in preparing this Safety Manual.
NOTICE OF COPYRIGHT PROTECTION
Copyright 2017, by the Association of Equipment Manufacturers. All rights reserved. This work may not be reproduced or disseminated in whole or in part by any means
without the prior written permission of the Association of Equipment Manufacturers.
Copyright ©2003
–
2016 AEM (Association of Equipment Manufacturers)
Revised 06/17
Summary of Contents for Trowel CT 24-4A
Page 6: ......
Page 16: ...Labels CT 24 4A 16 wc_si000742gb fm 2 Labels 2 1 Label Locations...
Page 65: ...33 Notes 34 Notes...
Page 68: ......