wc_tx003232gb.fm
22
Operation
CT 24-4A
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2
New Machine Set-Up
Trowels are shipped from the factory with the handle folded. Follow instructions on
Installing Blades
and
Unfolding Handle
when setting up new machines or when
installing new blades.
Summary of Contents for Trowel CT 24-4A
Page 6: ......
Page 16: ...Labels CT 24 4A 16 wc_si000742gb fm 2 Labels 2 1 Label Locations...
Page 65: ...33 Notes 34 Notes...
Page 68: ......