5-44
BA ET16 de* 1.0 * et16b510.fm
5 Operation
Mount
1. Install a bucket only if it is positioned on level ground with the flat side
facing downward.
2. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
3. Apply grease to the pins and articulations before inserting them.
4. Start the engine.
5. Straighten the stick so that bores
D
and
E
are flush.
6. Stop the engine. Raise the control lever base.
7. Insert pin
F
.
8. Actuate the stick cylinder until bores
H
and
I
are flush.
9. Stop the engine. Raise the control lever base.
10.Insert pin
J
.
11.Install linch pins
K
.
Fig. 174
D
K
F
E
H
I
J
K
Summary of Contents for ET09-02
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...