BA ET16 de* 1.0 * et16i400.fm
4-21
Putting into operation 4
Figures 90 and 91 refer to work with a Wacker Neuson hydraulic hammer.
Working with another tool can result in a different work area.
Assembly
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Tighten hexagonal bolts
B
(M8/8.8) to a torque of 25 Nm (18 ft./lbs.) at
the tie-down lugs
A
.
Information
Two people are required for assembly.
Fig. 91 (symbolic representation)
Fig. 92
A
A
Fig. 93 (symbolic representation)
B
Summary of Contents for ET09-02
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...