BA ET16 de* 1.0 * et16i400.fm
4-33
Putting into operation 4
Putting into operation for the first time and running-in period
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
• Check the fluid levels according to chapter “
Maintenance
”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods.
• Observe the maintenance plans
– see chapter “7.2 Wartungsüber-
.
Summary of Contents for ET09-02
Page 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Page 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Page 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Page 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Page 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Page 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Page 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...