Installation steps
!!
The design of counterparts such as the main chassis beam, angle brackets,
The design of counterparts such as the main chassis beam, angle brackets,
mounting plates or supports are the responsibility of the trailer manufacturer.
mounting plates or supports are the responsibility of the trailer manufacturer.
The robustness of the design should be able to withstand the permitted max.
The robustness of the design should be able to withstand the permitted max.
axial force of the 6 screws (c. 162kN).
axial force of the 6 screws (c. 162kN).
–
– Check traverses and make sure that valves, pipes, wires, air reservoirs
Check traverses and make sure that valves, pipes, wires, air reservoirs
are not hindering the installation.
are not hindering the installation.
– Check the connection points for the Half Horizontal Beams. For actual
dimensions please refer to the “SideWings Positioning” drawing.
– Please also refer to the “SideWings Setup” drawing to get an overview of
the location of each Half Horizontal Beam in relation to the others.
– Pre-install the pillars on the Half Horizontal Beams.
–
Retrofi t
: If there are no bore holes present yet, refer to the “SideWings
Positioning” drawing.
Measure and mark the position of the bore holes on the side of the trailer
I-Beam.
Drill the bore holes, preferably with a magnetic drill.
–
– Drape the Half Horizontal Beams with pre-installed pillars on the ground
Drape the Half Horizontal Beams with pre-installed pillars on the ground
in front of the appropriate bore holes.
in front of the appropriate bore holes.
Make sure that the different types of Half Horizontal Beam (different
Make sure that the different types of Half Horizontal Beam (different
lengths) with pre-installed pillars will be fi xed in the correct place, see
lengths) with pre-installed pillars will be fi xed in the correct place, see
“SideWings Positioning”.
“SideWings Positioning”.
To connect the Pillar to the Half Horizontal Beam, use mounting kit: 4 x
To connect the Pillar to the Half Horizontal Beam, use mounting kit: 4 x
M10x30 screws, 8 x ø10 washers and 4 x hexagon nuts for each pillar.
M10x30 screws, 8 x ø10 washers and 4 x hexagon nuts for each pillar.
The pillars must be mounted in a position between the wheels with enough
clearance to other parts.
The pillars must be installed in such a way that the pillar in front of the fi rst
wheel is defl ected by no more than 30mm when a force of 1000N is applied
to the pillar at the position of the lock, transverse to the direction of travel
The vehicle width of 2550mm for standard trailers and 2600mm for reefer
trailers must not be exceeded.
The ground clearance of the device must be at least 340mm for the last
4550mm of a semi-trailer, for docking reasons.
Summary of Contents for OPTIFLOW SIDEWINGS
Page 1: ...OPTIFLOWTM SIDEWINGS INSTALLATION MANUAL...
Page 32: ...32 OptiFlow SideWings Installation Undo the screws on the slider Remove the slider...
Page 45: ...45 OptiFlow SideWings Operation 7 Operation 7 1 Hatches Opening Press the first knob...
Page 48: ...48 OptiFlow SideWings Operation 7 3 Hinged Pillars Pull out the safety pin...
Page 54: ...54 OptiFlow SideWings Appendix 10 2 Example of SideWings Positioning drawing...