![WABCO OPTIFLOW SIDEWINGS Installation Manual Download Page 19](http://html1.mh-extra.com/html/wabco/optiflow-sidewings/optiflow-sidewings_installation-manual_3106733019.webp)
OptiFlow™ SideWings
Installation
The pillars must be installed in such a way that the pillar in front of the fi rst
wheel is defl ected by no more than 30mm when a force of 1000N is applied
to the pillar at the position of the lock, transverse to the direction of travel.
The vehicle width of 2550mm for standard trailers and 2600mm for reefer
trailers must not be exceeded.
The ground clearance of the device must be at least 340mm for the last
4550mm of a semi-trailer, for docking reasons.
The ground clearance must be a max. 500mm in front of the fi rst wheel.
!!
The minimum clearance between tires and SideWings must be at least
The minimum clearance between tires and SideWings must be at least
30mm.
30mm.
Check that at least 30mm of space between the tire and pillar is guaranteed
Check that at least 30mm of space between the tire and pillar is guaranteed
when moving lift axles.
when moving lift axles.
Min ≈ 30mm
– Fix pillars with a screwed joint of M12x35 size, material class 8.8.
– Use mounting kit of 4 x M10x30 screws, 8 x ø10 washers and 4 x
hexagon nuts for each pillar.
Summary of Contents for OPTIFLOW SIDEWINGS
Page 1: ...OPTIFLOWTM SIDEWINGS INSTALLATION MANUAL...
Page 32: ...32 OptiFlow SideWings Installation Undo the screws on the slider Remove the slider...
Page 45: ...45 OptiFlow SideWings Operation 7 Operation 7 1 Hatches Opening Press the first knob...
Page 48: ...48 OptiFlow SideWings Operation 7 3 Hinged Pillars Pull out the safety pin...
Page 54: ...54 OptiFlow SideWings Appendix 10 2 Example of SideWings Positioning drawing...