![VW CGRA Workshop Manual Download Page 82](http://html.mh-extra.com/html/vw/cgra/cgra_workshop-manual_1057406082.webp)
Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Loosen bolt -arrow- for sprockets about 1 full turn. To do this,
counterhold vibration damper using counterhold - T10172- .
– Turn engine by vibration damper to adjustment markings.
• Ground tooth of drive sprocket -arrow A- must align with bear‐
ing joint.
• The marked hole -arrow B- must be in line with the mark on
the oil pump.
Note
This position is reached only after every 4th full rotation.
– If the camshaft timing chain is to be replaced, remove cam‐
shaft timing chain
⇒ page 71
.
– If the camshaft timing chain is not to be replaced, mark position
of timing chains to sprockets of oil pump using a permanent
marker.
– Remove chain tensioner for camshaft timing chain -arrow-.
– Fix chain tensioner spring using 3 mm Allan key -A-.
– Remove chain tensioner for oil pump drive chain -arrows-.
Touareg 2010 ➤ , Touareg 2015 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 12.2019
76
Rep. gr.15 - Cylinder head, valve gear