![VW CGRA Workshop Manual Download Page 16](http://html.mh-extra.com/html/vw/cgra/cgra_workshop-manual_1057406016.webp)
Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Unscrew and disconnect earth wire -arrows-.
– Open cover -A- of central electrical system.
– Detach all connectors whose wires go to the engine.
– Remove engine wiring harness from plenum chamber and
place it on the engine.
– Disconnect connectors -1 to 4- for lambda probes.
WARNING
The fuel line is under pressure.
Fuel poses danger of injury to eyes and skin.
Wear protective goggles and protective clothing to avoid injury
and contact with the skin. Wrap a cloth around the connection
before loosening hose connections. Then reduce pressure by
carefully opening the connection.
– Wrap a cloth around the joint to catch any escaping fuel.
– Detach fuel supply line -arrow-.
Touareg 2010 ➤ , Touareg 2015 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 12.2019
10
Rep. gr.10 - Removing and installing engine