![VW CGRA Workshop Manual Download Page 76](http://html.mh-extra.com/html/vw/cgra/cgra_workshop-manual_1057406076.webp)
Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Place exhaust camshaft adjuster »32A« into camshaft timing
chain. Previously counted 16 rollers must lie between teeth at
arrow markings »24E« and »32A«.
– Connect camshaft adjuster »32A« with camshaft timing chain
onto exhaust camshaft. Observe the following when doing
this:
• The arrow -1- on camshaft adjuster »32A« must align with right
notch -2- of timing housing. Markings on timing housing
⇒ page 64
.
Note
It must be possible to easily position the exhaust camshaft ad‐
juster onto the exhaust camshaft. Move camshaft back and forth
slightly if necessary.
– Remove setting tool - T10363- from bearing shaft.
– Remove camshaft bar - T10068 A- .
– Install chain tensioner for camshaft timing chain -arrow-.
Specified torque: 50 Nm.
Touareg 2010 ➤ , Touareg 2015 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 12.2019
70
Rep. gr.15 - Cylinder head, valve gear