IN
INDEX
Mod. PAGURO
6000/9000/14000/18000/6500/8500
Date: 12.03.2020_Rev: 0.0
2
PAGE
3.3.2
Qualified technician............................................................................. 1
3.4
Categories of operators authorised to work and intervene on the generator....
1
3.4.1 Installers……………………………………………………………………….
1
3.4.2
Ordinary maintainers……………………………………………………... 2
3.4.3
Extraordinary maintainers…………………………….……………….…
2
3.5
Exposure to hazards and risks from materials…………………………………...
2
3.6
Operators training…………..………………….……….………………..…………
2
4. TRANSPORT AND HANDLING
4
Transport and handling……………………………………………………………………….
1
4.1
General notions……..……………………………………………………………....
1
4.2
Transport and handling……………………………………………………………..
2
4.2.1
Lifting and handling by crane or overhead crane………….…..………
2
4.2.2
Lifting and handling with forklift………………………………………….. 4
4.3
Unpacking……………………………………………………………………….…..
5
4.4
Handling the unpacked generator……..……………………………………...…...
5
4.5
Storage…..……………………………………………………………………….….
7
4.6
Shipping…..………………………………………………………………..……..…
7
4.7
Inspection on arrival…….…………………………………………………………..
7
5. INSTALLATION OF THE GENERATOR
5
Installation of the generator..………………………………………..……………….…….…
1
5.1
Set up for installation…………….……..………………………………….……..… 1
5.2
Fixing the generator…………………………………………………..……………… 1
5.3
Ventilation……………………………………………………………………….……
2
5.4
External connections………………………………………………………………… 3
5.5
Exhaust system installation (on request)…………………………….……………. 4
5.5.1
Traditional system…………………………………………………………… 5
5.5.2
On-board system with space shortage………………………………….…. 6
5.5.3
On-board system with long exhaust line…………………………………... 7
5.6
Fuel line…………………..………………………………….…………………..
7
5.7
Installation of the cooling system……………………………………………..…..…. 9
5.7.1
Siphon-break valve…………………………………………………………. 10
5.7.2
Raw water intake (on request)…………………………………………..… 11
5.8
Electrical connection………………………………………………………………….. 11
5.8.1
Connection to starting battery…………………………….......................... 11
5.8.2
Main output voltage………………………….…………….….……….
12
5.8.3
Transfer switch over shore line/generator ……………………..…..
13
5.8.4
Remote control panel……………………………………………….....
14
5.9
Pre-start inspections………………………………………………………………….. 15
5.10
Testing..............................................................................................................
15
6. INSTALLATION ERRORS
6
Installation errors………………………………………………………………………………
1
6.1
Water intake…….…………………………………………………………….………… 1
6.2
Waterline……………………………………………………………………………..
1