26
Body
S355_107
S355_061
S355_124
How it works
Before the roof package can be stored in the boot,
the following sequence of interdependent movements
needs to be carried out:
- While the C-segment is opened by the two
hydraulic cylinders, the two latches holding the
roof side members to the A-pillars are released
desmodromically.
- The boot lid is moved to the open position by its
hydraulic cylinders. The roof side member flaps
are opened by this movement with the help of
cables.
Lock roof side member to A-pillar
Unlock roof side member from A-pillar
S355_060