Supplied By www.heating spares.co Tel. 0161 620 6677
16
Linea Plus AG
5.7.4
Pass the cable through one of the cord an-
chorage points and connect the wires Brown
to L, Blue to N, and Green/Yellow to .
Arrange the cable so that should the cable slip
the anchorage the current carrying conduc-
tors become taut before the earthing conduc-
tor.
5.7.5
Securely tighten all terminal screws and ar-
range the cable with slack between the cable
anchor and the terminal block. Tighten the
cord anchorage screw until the cable is se-
cure.
5.7.6
Neatly arrange the external cable in such a
way that unrestricted opening of the controls
fascia is possible without strain on the cable.
5.7.7
External controls may be wired from terminals
TA to TA after removing the factory fitted link
(see fig. 18 & pages 49 - 52 for further details).
If a neutral is needed use the terminal marked
N on the terminal strip.
DO NOT CONNECT ANY WIRES TO THE
TERMINAL STRIP MARKED 'S' '-' 'POS' 'POS'
When connecting wires to the terminal strip it
is possible to remove the terminal strip from
the circuit board: Grasp the terminal strip
firmly and slide up to clear pcb. See fig.21.
When refitting the terminal strip it is important
that it is replaced correctly (with the screws
facing left).
Section 10 gives details of fitment for external
and internal controls (ie Vokera time clock).
If required pass the external controls cable
through the spare cord anchorage and ar-
range the cable so that should the cable slip
the anchorage the current carrying conduc-
tors become taut before the earthing conduc-
tor.
Fig. 21
Main Burner
Test Point
Fig. 19
Incoming Gas
Pressure Test
Point
Do not connect wires
to this terminal strip
Controls terminal
strip
Fig. 20
Normal
Operating
Position
Filling
Position
Closed
Position