Dosing system eco-CONTROL EC200 DUO
Operating and maintenance instructions
Version 1.4
Copyright ©
4.4
Qualifications of the operators and maintenance personnel
The operating organisation is responsible for ensuring that the operators and
maintenance personnel are suitably qualified. The Operating and maintenance
instructions must have been read and understood. The relevant technical rules and safety
regulations must be complied with.
4.5
Organisational measures
The necessary personal protective equipment must be
provided by the operating organisation. All safety devices
that are fitted must be checked regularly. Safety glasses
and overalls must be worn during operation and cleaning
to provide protection against any splashes of chemicals.
All of the safety information contained in the respective
Operating and maintenance instructions for the dispenser(s) that are connected to the
Dosing system must be complied with.
4.6
Preparation for commissioning - visual inspection
The Dosing system must be visually examined each day before the start of work and
before all shift changes. If there is any doubt as to the system's readiness for operation,
it must be shut down immediately and inspected by a specialist before operation
resumes.
4.7
Preventing material damage to the motors of the 2K-dispenser
The 2K-dispenser lead (connector 16, Chapter 5.2, Connections, on page 11)
may only be connected and disconnected when the power supply
is isolated.
The electronics in the drive motor could be damaged if this precaution is not
taken.
The 2K-dispenser should only be operated with the original pressure sensors
connected, which have been adapted to the controller.
Summary of Contents for PreeFlow eco-CONTROL EC200 DUO
Page 2: ...Item number 20202 print 21 2 12 ...
Page 44: ......