Page 19
NOTE
Not all bolts, lock washers, spacers, and washers are used during the installation.
To mount the VM032, VM042(H) or VM047 series system(s) onto the wall, please follow the steps below.
Mounting Monitor Brackets to the System
STEP 1
The VM042(H) system uses M6x35 bolts for the
monitor brackets. Thread the M6x35 bolt through an
M6 lock washer, an M6/M8 washer, the monitor
bracket (BB/CC) and finally into the monitor system
(left).
STEP 2
Repeat the above process for the remaining monitor
bracket.
NOTE
Make sure the monitor brackets are vertically
centered and level with each other.
Mounting the Wall Plate
Wood Stud Mounting
STEP 1
Select the location on the wall for wall plate. Make
sure there are sufficient spacing as mentioned in the
previous section between the monitor and walls when
selecting the location.
STEP 2
The wall plate (AA) must be mounted to two wood
studs at least 16” (406mm) apart. Use a stud sensor
to locate two adjacent studs. It is a good idea to verify
where the studs are located with an awl or thin nail
shown left.
STEP 3
Pre-drill a 2-1/2” (64mm) deep hole at the desired
height in each stud using a 3/16” drill bit. Make sure
these holes are in the center area of the studs and
level with each other. Use the wall plate as a
template to mark the location of the second hole in
each stud.
STEP 4
Drill 2-1/2” (64mm) deep holes using the 3/16” drill bit
in the marked locations.
STEP 5
Attach the wall plate to the wall using 4 pieces of 1/4”x2-1/2” lag bolts and 4 pieces of lag bolt washers. Make
sure the wall plate is oriented so the flat surface in the center of the plate is against the wall and that a set of lag
bolts is on each side of the two large holes in the center as shown above.
M6x35 bolt
M6 lock
washer
M6/M8
washer
Stud
sensor
16
inches
Wall plate