Venting the boiler
1.
Close the shut-off valves on the
heating water side.
2.
Connect the drain hose between
top valve
B
and a drain outlet.
3.
Open valves
A
and
B
, and vent
at mains pressure until no sound of
escaping air can be heard.
4.
Close valves
A
and
B
and open
the heating water shut-off valves.
Venting the heating system
1.
Close the gas shut-off valve and
switch ON the control unit.