For further details regarding faults,
see page 71.
Checking the static and supply pressure
Danger
Higher CO emissions can lead to poisoning.
Check the CO emissions before and after any work on gas appliances, to
prevent any health hazards and to ensure the perfect operational condi-
tion of the system.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Thoroughly vent
the tank and gas supply lines after flushing.
1.
Close the gas shut-off valve.
2.
Release screw
A
inside test con-
nector "PE" on the gas train, but do
not remove it; then connect the
pressure gauge.
3.
Open the gas shut-off valve.
4.
Measure the static pressure and
record it in the service report.
Set value: max. 57.5 mbar.
5.
Start the boiler.
Note
During commissioning, the boiler
can enter a fault state because of
airlocks in the gas pipe. After
approx. 5 s, press "
E
RESET" to
reset the burner.
Further details regarding the individual steps
(cont.)
14
Commissioning, inspection, maintenance
5692
673
GB
Summary of Contents for VITODENS 300-W
Page 111: ...Parts lists cont 111 Parts lists 5692 673 GB...
Page 112: ...Parts lists cont 112 Parts lists 5692 673 GB...
Page 113: ...Parts lists cont 113 Parts lists 5692 673 GB...
Page 114: ...Parts lists cont 114 Parts lists 5692 673 GB...
Page 121: ...121 5692 673 GB...
Page 122: ...122 5692 673 GB...
Page 123: ...123 5692 673 GB...