
Vitocrossal 300 CU3A 26 to 199 Service
5673 649 - 18
4
Page
Safety
General Information
Start-up
Safety, Installation and Warranty Requirements
..............2
Product
documentation..........................................2
Warranty..............................................................2
Licensed
professional
heating contractor..................2
Contaminated
air...................................................2
Advice to owner....................................................2
Operating and Service Documentation......................2
Carbon
monoxide...................................................2
Fresh
air..............................................................2
Equipment
venting.................................................2
Fiberglass wool and ceramic fiber materials..............3
First aid measures..................................................3
About the Service Instructions
......................................3
Necessary Tools
.........................................................6
Important Regulatory and Installation Requirements
........6
Codes..................................................................6
Technical
literature................................................6
Initial
start-up.......................................................6
Working on the equipment.....................................6
Instructing
the system user....................................6
For installations on the Commonwealth of
Massachusetts
.......................................................7
CSD-1 Field Testing of High Limit Switches.................
.7
Applicability
..............................................................8
Product Information
....................................................8
Mechanical Room
......................................................9
Filling the Heating System
..........................................10
Removing the Front Panels
........................................11
Filling Siphon With Water
...........................................11
Opening the Control Unit
...........................................12
Check Power Supply Connection
.................................12
Start-up Wizard
.........................................................13
Select language..................................................13
Set time and date...............................................13
Select
temperature
unit.......................................13
Set DHW temperature setpoint.............................13
Selecting
zone
circuits.........................................14
Slecting
zone
circuit
type.....................................14
Select
fixed setpoint............................................14
Adjust
heating
curve............................................14
Select pump output.............................................15
Confirm pump output...........................................15
Zone circuit temperature setting............................15
Weather
compensated
operation...........................15
Designating Heating Circuits
.......................................16
Setting High Altitude
.................................................16
Select Gas Type
.......................................................17
Convert Fuel Type to LPG
..........................................17
Measuring the Static Pressure and Running Pressure
.....18
Set Maximum Output
................................................19
Check All Primary and Secondary Circuit
Connections for Leaks
...............................................19
Check Gas Pipes and Fittings for Leaks
........................19
Perform Combustion Analysis
.....................................20
Checking the Direct Vent (coaxial) System Tightness...
.20
Sequence of Operation and Potential Faults During
Each Start-up Cycle
...................................................21
Vitocrossal 300 CU3A 26 to 199 Service
Page
Table of Contents