147
Fax the following request, together with the enclosed system scheme, to your local Viessmann sales office.
A competent employee must be present when the system is commissioned.
System details:
Requester
System location
Tick check list boxes:
=
Hydraulic scheme for heating system included
=
Heating circuits fully installed and filled
=
Electrical installation completed
=
Hydraulic lines fully thermally insulated
=
Installation completed in full up to refrigerant circuit
=
All windows and external doors sealed
=
Components for cooling mode fully installed (optional)
=
Components for ventilation fully installed (optional)
=
Components for PV system fully installed (optional)
Preferred appointment:
1.
Date
Time
2.
Date
Time
The work that is requested to be carried out by Viessmann will be billed in accordance with the latest Viessmann
pricelist.
Place / Date
Signature
Final decommissioning and disposal
Viessmann products can be recycled. Components
and substances from the system are not part of ordi-
nary household waste.
For decommissioning the system, isolate the system
from the power supply and allow components to cool
down where appropriate.
All components must be disposed of correctly.
Appendix
Commissioning order
5831412
Appendix