24
Hydraulic connection requirements
■ Install hydraulic connections on site
stress-free.
■ Make the hydraulic connections
between several heat pumps on site.
■ All required components (with a suita-
bly designed plate heat exchanger) for
the cooling circuit must be provided on
site.
Preparing for installation
Siting
(cont.)
5848 246 GB