27
Sound and vibration isolation when line entry is above ground
level
Note
Route connecting cables and refrigerant
lines separately.
B
C
A
D
Note
Only for 230 Vappliances
A
Pipe bends for compensating vibra-
tions
B
Tube clips with EPDM inserts
C
Line entry, e.g. KG conduit with ther-
mal insulation
D
Cables/leads between internal –
external units
Installation sequence
Connecting refrigerant lines
(cont.)
5546 699 GB
Installation