7
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking the high limit safety cut-out setting
.............
9
•
2. Filling the heating system with water and venting
......
9
•
3. Filling the siphon with water
.........................................
9
•
4. Checking the gas type
.................................................... 10
•
5. Conversion to natural gas E
.......................................... 11
•
6. Conversion to LPG P
...................................................... 14
•
7. Height adjustment
.......................................................... 16
•
•
8. Configuring the motorised flue gas damper (flue gas
cascade)
.......................................................................... 18
•
•
•
9. Commissioning the system
........................................... 18
•
10. Reducing operational output (if necessary)
................. 20
•
•
•
11. Checking static pressure and supply pressure
........... 21
•
•
•
12. Checking the rotary damper setting (for 400 and 620
kW)
................................................................................... 23
•
13. Overview of differences between the three burner
sizes
................................................................................. 24
•
•
•
14. Checking the CO
2
content
............................................. 27
•
•
•
15. Checking the CO content
•
•
•
16. Checking the flue gas temperature
•
•
17. Displaying the ionisation current
.................................. 29
•
•
18. Shutting down the system
............................................. 30
•
•
19. Opening the boiler door
................................................. 34
•
•
20. Cleaning the combustion chamber and heating
surfaces
........................................................................... 34
•
•
21. Checking the gaskets and thermal insulation
components
.................................................................... 35
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance