background image

Victoria-05 Ltd.

 

 

 

 

It is not recommended to install a pellet stove in rooms where there is mounted another heater. If it does, it must be equipped 
with a separate air duct. 

Compatibility with other devices: 

Pellet stove should not be installed in the same room in which there are absorbers and / or devices that reduce ventilation in the 
room. 

Checking electrical connections: 

Pellet stove is equipped with a power cable to be connected to a voltage 230V / 50Hz. Changes exceeding by 10% the voltage 
can damage the appliance. Electrical grid-circuit must comply with the provisions of the laws and requirements for grounding. 
According to the requirements for electrical grid-circuit connection, pellet stove should be installed to ensure free access to the 
plug and socket (230V / 50Hz). According to the safety requirements it is prohibited the room where the pellet stove is installed 
to have electrical installation mounted on the floor. Lack of bonding / grounding can cause damage for which the manufacturer 
is not responsible. 

Positioning: 

To  ensure  well  operation,  pellet  stove  should  be  levelled.  The  floor  on  which  is  placed  the  pellet  stove  must  be  of  non-
combustible materials (concrete, marble, terracotta, etc.)  

Given the easy servicing and refuelling, we recommend the following minimum free distance around the pellet stove: 1000 mm 
at the front, back and sides -500 mm, top -minimum 1000 mm. 

Safe distances for fire safety: 
When installing a pellet stove and storage of wood pellets must be respected the fire requirements! 

It is recommended that an appropriate place to mount a fire extinguisher be ensured.  

It is forbidden to store the wood pellets directly to the pellet stove or less than a 400 mm. 

The optimal distance between the pellet stove and combustible materials is 800 mm in front and 300 mm from the sides and the 
back. Inflammable objects should not be placed on the top board of the pellet stove. 

If the chimney is connected to the timber wall or other inflammable material, suitable materials such as ceramic wool should be 
used to isolate it. 

Fresh air opening:  

Imperative to ensure submission of fresh air! 

 

The room, in which is mounted pellet stove must have an opening for fresh air with a cross section of not less than 80 cm² 

to 

ensure a sufficient supply of oxygen necessary for combustion. Additionally, it can be delivered outside air through a pipeline of 

Ø 50 mm. In this case, 

it is possible to emerge condensate. If necessary, the opening for external air can be protected by a grid. 

Pipe for outside air must be mounted on the nearest outer wall to the pellet stove. Its length should not exceed 1 m, should not 
have  curves  and  its  location  must 

prevent  clogging.  The  outer  end  of  the  pipe  must  end  with  a  knee  90˚,  downward  or  be 

provided with protection against wind. 

 

Chimneys: 

Pellet stove works constantly with a fume extractor and pressure in the flue pipes and chimney. 

It is forbidden flue gases to be discharged directly from the pellet stove through the wall into the atmosphere. Required installed 
chimney, which takes flue gases safe for human health altitude over the area of habitation. 

Only the pellet stove should use chimney and no other appliances must be connected to it. The flue gases are emitted from the 
combustion  chamber  of  the  pellet  stove  to  the  atmosphere  t

hrough  a  flue  socket  Ø  80  mm  loca

ted  in  the  rear.  It  is 

recommended  at  the  beginning  of  the  vertical  section  of  the  chimney  to  mount  a  T-fitting,  with  a  section  for  collecting 
condensate. Pellet  stove must  be connected to the  chimney by steel  flue pipes, certified according to EN 1856. The flue pipe 
system must be hermetically insulated with materials resistant to high temperatures (heat-resistant silicone or grease). Allowed 
to have a horizontal section with a length of 2 m. Horizontal section must be a minimum slope of 3% and not more than two 

curves at 90°.

 

If the flue socket of the pellet stove is connected to a metal chimney, it must have a vertical portion length of not less than 1.5 m 
and fitted with a wind protection. Chimney may be located internally or externally. It should be well insulated. 

If the pellet stove is connected to a masonry chimney, it must be intended for appliances for solid fuel. If the chimney has a size 

larger from Ø150 mm in diameter, internally along its entire length must be in

stalled tube of stainless steel with a diameter of 

Ø150 

mm, as the free space must be isolated by masonry. All parts of the chimney should have free access to inspection. At the 

bottom of the chimney must be built manhole allowing opening and cleaning at least once a year. On top of the chimney must 
be installed a wind protection hat, according to current regulations. 

 

 

Summary of Contents for VITTORIA 8

Page 1: ...INSTRUCTION MANUAL for installation and operation of air pellet stove VITTORIA 8...

Page 2: ...ONTROL UNIT 10 10 2 3 MAIN MENU 11 10 2 4 INSTALLER SETTINGS 13 10 2 5 SERVICE TECHNICIAN SETTINGS 13 10 3 OUTS TEST 14 11 INSTRUCTION MANUAL 14 11 1 WOOD PELLETS LOADING 14 11 2 WOOD PELLET REFUELLIN...

Page 3: ...ailure of any of its components Safety components are activated without outside interference Necessary for the proper operating of the pellet stove is its proper installation in accordance with the fo...

Page 4: ...Victoria 05 Ltd 4 3 Technical data and dimensions Drawing 1...

Page 5: ...Alarm Exhaust gases Pressostat Connected to the combustion chamber It reads the values of the vacuum in the combustion chamber and compares it with the pressure in the room Temperature sensor of the...

Page 6: ...m Pressure Switch Pressostat Measures the vacuum in the combustion chamber 7 Operating mode Pellet stove works with wood pellets They are cylindrical granules made of pressed wood whose combustion is...

Page 7: ...rea Pellet stove is designed developed programmed and tested to operate with wood pellets class A1 according to EN plus and BDS EN ISO 17225 2 2014 with the following parameters Maximum diameter 6 mm...

Page 8: ...to ensure a sufficient supply of oxygen necessary for combustion Additionally it can be delivered outside air through a pipeline of 50 mm In this case it is possible to emerge condensate If necessary...

Page 9: ...llet stove is coated by high temperature resistant paint but not against corrosion In case of accumulation of dust surfaces can be cleaned with a soft brush or a dry cloth but in any case not with a d...

Page 10: ...utton a green bar appears at the bottom of the display Wait until it is full to execute the command Hiding the green bar means that the value is stored correctly The return icon is removed during the...

Page 11: ...le is connected 0 no module 1 a module is present but is not connected 2 a module is connected to the router Languages Here there is a Control Unit Language shortcut key The system offers four languag...

Page 12: ...e fireplace will stop The settings have been restricted in four access levels The first level is Installer The second level is Service Technician The third level is Delete Errors with a password 7777...

Page 13: ...ion can do among four display languages Bulgarian English Dutch and German 10 2 5 Service technician settings Types of settings for service technician entered with service technician password Paramete...

Page 14: ...pellets loading The capacity of the pellet fuel hopper is 24 kg The opening for charging the hopper is with dimensions 167 300 mm If the hopper is left without pellets the pellet stove will stop worki...

Page 15: ...in the end P1 Switching among these is based on the temperature pre set as room temperature If the room temperature is set to 30 in the Modulation 5 Menu the Thermal Difference one should set is 4 in...

Page 16: ...ve was not used for an extended period Clean the ignition 12 3 Seasonal maintenance performed by the installer The user has to contact the installer to perform the seasonal maintenance Disconnect the...

Page 17: ...cted alarm s activation on the right To delete the alarms on the right enter the password 7777 To delete the alarms on the left too enter the password again Pressure Switch Activated if insufficient v...

Page 18: ...an the flue gasses be sent out directly through the wall NO Removal must be in accordance with existing standards For proper operation of the pellet stove the chimney metal or masonry has to be comple...

Page 19: ...r 4 Ignition 18 Left side plate 5 Pressure switch 19 Right side plate 6 Controller set 20 Special tool 7 Display 21 Fume temperature sensor 8 Crossflow blower 22 Thermostat of the pellet fuel hopper 7...

Page 20: ...Victoria 05 Ltd 20...

Page 21: ...03 2021 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 21...

Page 22: ...Victoria 05 Ltd 22...

Page 23: ...maining population For other countries please contact you dealer Any warranty repair of the pellet stove is recorded in the diary of warranty Warranty of the pellet stove is NOT VALID in the following...

Page 24: ...for repairs under warranty Company Receipt date Type of repair Delivery date Carried out Victoria 05 Ltd 1B Ivan Momchilov Str 5100 Gorna Oryahovitsa Republic of Bulgaria phone 359 618 60282 e mail in...

Reviews: