ALT-8000 Getting Started Manual
14
3.1.B
Grounding Power Cord
For AC operation, the AC Line Cable, connected to the
External DC Power Supply, is equipped with a standard
three-prong plug and must be connected to a properly
grounded three-prong receptacle. It is the customer's
responsibility to:
•
Have a qualified electrician check receptacle(s) for
proper grounding.
•
Replace any standard two-prong receptacle(s) with
properly grounded three-prong receptacle(s).
3.1.C
Operating Safety
Due to potential for electrical shock within the Test Set, the
Case Assembly must be closed when the Test Set is
connected to an external power source.
4
EXTERNAL CLEANING
The following procedure contains routine instructions for
cleaning the outside of the Test Set.
STEP
PROCEDURE
1. Clean front panel buttons and display face with soft lint-
free cloth. If dirt is difficult to remove, dampen cloth with
water and a mild liquid detergent.
2. Remove grease, fungus and ground-in dirt from surfaces
with soft lint-free cloth dampened (not soaked) with
isopropyl alcohol.
3. Remove dust and dirt from connectors with soft-bristled
brush.
4. Cover connectors, not in use, with suitable dust cover to
prevent tarnishing of connector contacts.
5. Clean cables with soft lint-free cloth.
DO NOT USE A THREE-PRONG TO TWO-
PRONG ADAPTER PLUG. DOING SO
CREATES A SHOCK HAZARD BETWEEN
THE CHASSIS AND ELECTRICAL
GROUND.
W A R N I N G
DISCONNECT POWER FROM TEST SET TO
AVOID POSSIBLE DAMAGE TO
ELECTRONIC CIRCUITS.
C A U T I O N
All manuals and user guides at all-guides.com
Summary of Contents for ALT-8000
Page 1: ...ALT 8000 Radio Altimeter Getting Started Manual All manuals and user guides at all guides com ...
Page 2: ...all guides com ...
Page 8: ...all guides com ...
Page 14: ...all guides com ...
Page 20: ...all guides com ...
Page 26: ...all guides com ...
Page 32: ...all guides com ...
Page 38: ...all guides com ...