16
Fig. №. 22 Mounting of the upper part of the cladding
10.
According to Fig. No. 23, put the rear part of the cladding (3) onto 4 pcs of the screws M5 x 12 (4) between the side-wall parts of the
cladding (1 and 2).
Cable of the electric wiring mustn't contact the boiler drum and the chimney pot.
11.
As necessary, screw the holder of the cleaning tools (5) to the left or right side-wall part of the cladding (1 and 2) with help of 2 pcs of the
bolts M5 x 12 (4).
Fig. №. 23 Mounting of the rear part of the cladding and the cleaning tool holder
Fig. №. 24 Demounting of the control cabinet upper part
1.
Right side-wall part of the cladding
2.
Left side-wall part of the cladding
3.
Insulation of upper part of the cladding
4.
Connecting rod
5.
Manometer
6.
Upper part of the cladding
7.
Thermometer well
8.
Manometer back-pressure valve
9.
Control cabinet
10. Cover
11. Washer 3.2
12. Screw M3 x 12
1.
Left side-wall part of the cladding
2.
Right side-wall part of the cladding
3.
Rear part of the cladding
4.
Screw M5 x 12
5.
Cleaning tool holder
6.
Insulation of the rear sheet-metal cover
7.
Screw M5 x 10
8.
Flue gases temperature sensor
9.
Single-place well for the
G1/2“ output-water sensor - short
1.
Control cabinet lower part
2.
Screw
3.
Control cabinet lower part