11
5
Delivery and assembly
5.1
Delivery and accessories content
The boiler is supplied according to a purchase order so that a boiler drum and boiler cladding are placed on a pallet. The lining of the
combustion chamber is packed separately. Accessories is placed inside the boiler drum, and is available after opening the stocking door. The
boiler is packed in transport package and it is not allowed to tip it during transportation.
Standard content of the boiler supply:
boiler on a pallet
-
return water flange with a thread
1 pcs
-
heating water flange with a thread
1 pcs
-
sealing
90 x 60 x 3
2 pcs
-
washer 10,5
8 pcs
-
nut M10
8 pcs
-
filling and discharge cock Js 1/2“
1 pcs
-
sealing
60 x 48 x 2
1 pcs
-
capillary spring
1 pc
-
wave spring
1 pc
-
manipulation key
1 pc
-
throttle valve screw
2 pcs
assembly of combustion chamber lining
-
refractory glue, 50 ml, for gluing the nozzle
1 pc
inclined grate
1 pc
cladding including ash-pan and insulation
-
lowered bracket
2 pcs
-
washer 10,5
4 pcs
-
nut M10
4 pcs
-
spring clip
4 pcs
-
screw M5 x 12
10 pcs
-
connecting spine
4 pcs
-
manometer
1 pc
-
screw M8 x 12
4 pcs
cleaning tools
-
hook
1 pc
-
brush with a extending stick
1 pc
-
spike
1 pc
-
cleaning tool holder
1 pc
chute for the lining (only for the size of 8 and 9 sections)
1 pc
electric accessories of the boiler
1 pc
shell with a ventilator
1 pc
pack of accessories of the boiler
1 pc
commercial and technical documentation
Additional accessories (it is not a part of supply):
Cast-iron pedestal for the 5-section boiler (ordering code 17657)
Cast-iron pedestal for the 6-section boiler (ordering code 18522)
Cast-iron pedestal for the 7-section boiler (ordering code 17658)
Necessary accessories (it is not a part of supply):
Final-cooling loop (1 pc), including a flange, or two-way safety valve DBV 1 - 02, including siseal (10 g). This equipment doesn't need to be
used in the case of an opened heating system.
Thermostatic valve TS 130 (STS 20)
– TV 95°C – can be bought in supermarkets (only in case of delivery with the final-cooling loop)
Safety valve 1 pc
Accessories delivered by user's request (it is not a part of supply):
Filte
r 3/4“ (for the boiler with a two-way safety valve DBV 1 – 02)
Boiler equipment ordered as "additional accessories, necessary accessories and accessories delivered by user's request" in not
included into the basic price of the boiler.