background image

13 

8. 

Boiler operation by user 

 
The  boiler  works  automatically according to the regulation elements setting and the user only does 
the  following  service  activities  that  the  worker  who  puts  the  boiler  into  operation  is  obliged  to 
acquaint him with: 

1.  Boiler switch-off or switch-on

2.  Control of pressure in the heating system.  

 

9. 

IMPORTANT WARNINGS 

 

1. 

The boiler only can be used for the purpose that it is destined for.  

2. 

Boiler environment: it must be ensured a constant supply of fresh air. 

3. 

Boiler  can  only  be  operated  by  adult  persons  and  children  without  being  supervised  by  adults 
must not be left nearby the boiler. 

4. 

The  boiler  is  not  destined  for  the  use  by  persons  (incl.  children)  whose  physical,  sensual  or 
mental  disability  or  lack  of  experience  and  knowledge  prevent  them  from  a  safe  use  of  the 
appliance unless they are supervised or if they were not instructed on the use of appliance by a 
person responsible for their safety.  

5. 

Children should be supervised in order to ensure that they do not play with the appliance. 

6. 

If the boiler is going to be put out of operation for a long time it must be disconnected from the electricity- 
from the socket. 

7. 

In case of a failure in combustion products outlet from the combustion products draught diverter 
(countermove,  clogged  chimney)  the  combustion  products  return  flow  fuse  will  close  the  fuel 
supply to the boiler. 
The user can unblock the fuse by means of TS unblocking push-button. The boiler 
can only be restarted once the combustion products return flow fuse sensor has cooled down it means 
after 10 minutes. 

8. 

The boiler room must be kept clean and dust-free. All sources of pollution must be removed from the 
boiler room and the boiler must be put out of operation during the works (insulation works, boiler room 
cleaning)  that  cause  the  dustiness.  Even  a  partial  clogging  of  burner  with  impurities  will  degrade  the 
combustion process and endanger the economical and reliable operation of boiler. We don’t recommend 
to keep the domestic animals (like cat, dogs etc.) in boiler room. 

9. 

If there occurs the danger of development and penetration of combustible vapours or gases into 
the boiler room,
 or during the works where there arises a transient risk of fire or explosion (gluing the 
floorings,  painting  with  combustible  paints),  the  boiler  must  be  put  out  of  operation  long  enough 
before the works start.
 

10.  Don’t  put  any  objects  made  of  flammable  material  on  boiler  and  within  a  distance  smaller  than 

the safe distance from it (see chapter no. 5.2.). 

11.  In  winter  (for  example  while  leaving  for  holidays),  it  is  necessary  to  ensure  checking  of 

functionality in the necessary degree as regards the boiler and the whole heating system in order 
that water did not freeze in the system and the equipment was not damaged from some external 
reason (e.g. power failure, gas failure or similar.
 

12.  The  user  is  obliged  to  put  a  professional  contractual  service  accredited  by  VIADRUS  a.s.,  the 

boiler  manufacturer  in  trust  with  commissioning,  regular  maintenance  and  defects  elimination, 
otherwise the boiler proper function isn’t guaranteed. „VIADRUS GRAND G 36 BM boiler quality 
and  completeness  certification“  after having been filled out by contractual service organization 
serves as the „Guarantee certificate“.
 

13.  The boiler regular maintenance must be done once a year according to the next chapter. 

14.  During  assembly,  installation  and  operation  of  the  appliance  it  is  necessary  to  comply  with 

standards that apply in the relevant country of destination. 

If you fail to meet these conditions you cannot requisite the guarantee repairs.  

Summary of Contents for GRAND G 36

Page 1: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Page 2: ...ter construction 14 7 3 Honeywell V 4044F three way valve technical data 16 8 Positioning and installation 16 8 1 Regulations and directions 16 8 2 Positioning possibilities 17 9 Delivery and assembly...

Page 3: ...transient resistance tests If you require preferential heating of hot service water you can order separately stationary VIADRUS OV 100L heater the design of which corresponds to VIADRUS GRAND G 36 boi...

Page 4: ...flow rate at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Effic...

Page 5: ...ear part of boiler is equipped with pipes 1 1 2 At the return water connection there is installed the discharge valve At the heating water outlet there must be installed an automatic bleeder valve whi...

Page 6: ...part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade 24 Inlet PG 9 25 Inlet PG 11 26 Electric panel 27 Electric panel cover 28 Thermoman...

Page 7: ...ht outer section 5 1 1 Equitherm regulation Optionally together with boiler there is delivered one of four kinds of regulation or their combination according to the purchase order key stated in chapte...

Page 8: ...ng valves Other regulator characteristics The heating circuits can be preset as independent two independent heating circuits or as dependent floor heating combined with radiators The independent sched...

Page 9: ...l switch on If the flame goes out during the normal operation the ignition automatics will repeat the ignition cycle The ignition pilot burner is switched off together with the main burner Other contr...

Page 10: ...H1 boiler under voltage signalling Z1 suppression component TC241 BT2 combustion products thermostat H2 failure signalling BT1 safety thermostat BT4 boiler thermostat M9 combustion products ventilato...

Page 11: ...sion component X1 X11 boiler terminal boards M9 combustion products ventilator Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater thermostat BT5 indoor thermostat dr...

Page 12: ...ll S4565 BF 1112 1 Y1 gas valve VK 4100 A 1002 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main switch H1 boiler un...

Page 13: ...1 A4 the pump operation is controlled according to regulator programme see chap 5 1 Fig no 5 Grundfos UPS 25 40 pump characteristics 7 Stack hot service water heaters 7 1 Technical data of recommended...

Page 14: ...ey die within several seconds 7 2 Heater construction To the boiler you can order VIADRUS OV 100L separate stack heater for a preferential hot service water preparation in the same design as G 36 boil...

Page 15: ...ck 16 radiator vale Note It is possible to use a combined fitting consisting of a safety valve and a clack valve Hot service valve inlet Cold service water inlet heating water inlet return water inlet...

Page 16: ...ding to the valid regulations must be prepared for installation The heating system must be filled with water that meets the SN 07 7401 requirements especially its harness must not exceed the required...

Page 17: ...0 335 1 ed 2 Household and similar electrical appliances Safety Part 1 General requirements EN 60 335 2 102 Household and similar electrical appliances Safety Part 2 102 Particular requirements for ga...

Page 18: ...k wood hobrex boards plywood werzalit umakart sirkolit C D medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring E F easily combustible Asphaltboard fibreboards cellulo...

Page 19: ...lation A1 1 pc regulator RVA 43 222 set of connectors SVA 43 222 terminal board WAGO 63 with a conductor bundle 43 submersible sensor B2 type QAZ 21 Regulation A2 1 pc regulator RVA 43 222 1 pc regula...

Page 20: ...sition and well balanced 2 Mount the TE joint at the heating water outlet from boiler the discharge valve at the heating water inlet and automatic bleeder valve Fig no 12 at the heating water outlet T...

Page 21: ...sembly Fig no 14 Honeywell V 4044F three way valve 8 Connection to gas Gas is connected to boiler through the gas spherical closing cock 9 Release the bleeder screw of automatic bleeder valve It must...

Page 22: ...ating system with water we only refill a cold boiler in order to prevent the boiler sections from disruption 10 Commissioning instructions for contractual service organization The boiler commissioning...

Page 23: ...ited and in case of a superior regulation to a higher temperature the rated output is ignited If the ignition cycle has run up without lighting the burner then the failure signalisation lights up on t...

Page 24: ...ush button in shape off an arrow 3 If the arrow is turned against the gas flow direction the start is the slowest see fig no 17 curve MIN 4 If the arrow is turned in the gas flow direction the start i...

Page 25: ...central heating After the water heater has been heated to the required temperature the three way valve switches automatically to the heating position and heating water from boiler flows into radiators...

Page 26: ...urn flow fuse will close the fuel supply to the boiler The user can unblock the fuse by means of TS unblocking push button The boiler can only be restarted once the combustion products return flow fus...

Page 27: ...d air through the diffuser or by using the vacuum cleaner mount back the ignition pilot burner and then the whole burner remove the dust from ignition pilot burner by using the compressed air 11 Mount...

Page 28: ...uctors Check and exchange the connection terminal U phase conductor terminal N zero conductor Wrong diameters of gas nozzles in burner Check whether the nozzles diameter in the main burner corresponds...

Page 29: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Page 30: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 31: ...t by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service orga...

Page 32: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Page 33: ...ll be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contract...

Page 34: ...34...

Page 35: ...ied out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servic...

Page 36: ...36 Date of revision 16 2013 GB...

Page 37: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Page 38: ...es 8 6 Delivery and assembly 10 6 1 Assembly procedure 10 7 Commissioning instructions for contractual service organization 11 7 1 Verification activities before commissioning 11 7 1 2 Putting into Op...

Page 39: ...cuits that is equipped by a combined regulation valve SIT 820 NOVA mV with igniting by means of a burning pilot with a burning electrode a thermocouple and an mV generator Connection of a room thermos...

Page 40: ...at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Efficiency at m...

Page 41: ...is placed in the head casting of the right edge section A built in draft damper with a demountable cleaning cover and a neck for putting a stack on are connected to the top part of the boiler body by...

Page 42: ...he frontal part of boiler shell 16 Side shell right 17 Side shell left 18 The upper part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade...

Page 43: ...pecial one stage combined electromagnetic valve 1 SIT 820 NOVA mV with continuous starting up for ZP The boiler may be operated at firmly set output power from the production company the boiler is set...

Page 44: ...N 12007 3 Gas supply systems Pipelines for maximum operating pressure up to and including 16 bar Part 3 Specific functional recommendations for steel EN 12007 4 Gas supply systems Pipelines for maximu...

Page 45: ...ceramic tiles mortars fireproof plasters A2 combustible with difficulty acumin izumin heraklit lignos boards and basalt felt fibreglass boards B hardly combustible Beech and oak wood hobrex boards pl...

Page 46: ...by using the boiler base plate in which there are on the left and right hand side prepared two circular openings determined for putting on the removal hooks By means of hooks the boiler can be lifted...

Page 47: ...nd atmosphere During the heating season the water expanding in the tank absorbs the oxygen which increases the corrosive effects and at same time water evaporates significantly For a refill there can...

Page 48: ...ng burner Turn the regulation knob to the position of igniting and ignite the burner by the piezoelectric ignitor Set the size of the flame by means of the screwdriver and the setting screw in order t...

Page 49: ...the boiler must be put out of operation during the works insulation works boiler room cleaning that cause the dustiness Even a partial clogging of burner with impurities will degrade the combustion p...

Page 50: ...hole burner back at its place 11 Re assemble the cover of draft damper the insulation and the top part of the casing 12 Open the gas inlet and switch the boiler on 13 Check the tightness of the gas in...

Page 51: ...e opening Gas piping air lock Bleed the piping Gas valve does not open Valve exchange Failure of thermocouple Change the thermocouple Failure of generator or faulty generator contact Change the genera...

Page 52: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Page 53: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 54: ...18...

Page 55: ...ut by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service org...

Page 56: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Page 57: ...ill be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contrac...

Page 58: ...22...

Page 59: ...ried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servi...

Page 60: ...24 Date of revision 32 2013 GB...

Reviews: