
2
1
3
4
5
6
30
07/2020
VETRON 5300 - POST BED MACHINE - INSTRUCTION BOOK
03. OPERATION OF THE MACHINE
05.
WINDING THE BOBBIN THREAD
CAUTION!
Avoid touching rotating parts to avoid the risk of injury or damage of the machine.
01. Turn the machine on.
02. Place a bobbin
1
on the bobbin winder
2
.
03. Push the lever
3
towards the bobbin.
04. After the winding process is finished, the lever
3
automatically moves back.
05. Remove the bobbin and cut the thread at the knife
4
.
06. Loosen the screw
5
and move the lever
3
to adjust the amount of thread
on the bobbbin. There should be a gap of 1 mm between thread and bobbin edge.
NOTICE!
If necessary, the bracket
6
can be slightly bended to the left or right to optimize the
thread flow to the bobbin.
Summary of Contents for 5300
Page 1: ...5300 INSTRUCTION MANUAL 07 2020 ...
Page 2: ......
Page 3: ...STANDARD 5300 5320 DEEPSTITCH 5380 5300 INSTRUCTION BOOK 07 2020 ...
Page 16: ...14 07 2020 VETRON 5300 POST BED MACHINE INSTRUCTION BOOK 01 PREFACE ...
Page 40: ...38 07 2020 VETRON 5300 POST BED MACHINE INSTRUCTION BOOK ...
Page 70: ...68 07 2020 VETRON 5300 POST BED MACHINE INSTRUCTION BOOK ...
Page 74: ...72 07 2020 VETRON 5300 POST BED MACHINE INSTRUCTION BOOK 06 WEAR PARTS ...
Page 81: ......