■
Connecting two storage shelves to an appliance
■
Connecting three storage shelves to an appliance
■
Connecting four storage shelves to an appliance
■
■
■
Turning on the hardware and verifying operation
Overview
Several procedures are involved in the process of adding one or more storage
shelves to a 4TB appliance that does not have any storage shelves at all.
Caution:
Veritas service personnel must perform all tasks that involve the inside
of the appliance chassis.
The 4TB appliance needs additional components to support the external storage
shelves. The NetBackup 5240 External Storage Kit contains the following required
hardware components.
■
One external RAID controller PCIe card
■
Eight, 8Gb, Dual in-line memory modules (DIMMs)
■
One Maintenance Free super-cap Backup Module (MFBU) Kit
The procedures in this appendix explain the following tasks.
■
Installing the External Storage Kit components into the appliance
■
Installing one or more storage shelves into a rack
■
Connecting the appliance to the storage shelves
■
Connecting the storage shelf power cords
■
Turning on the storage shelves and verifying operation
■
Turning on the appliance and verifying operation
These tasks must be performed in the order that is provided in this appendix.
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Overview
68
Summary of Contents for NetBackup 5240
Page 4: ......
Page 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Page 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Page 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Page 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...