3
Connect one end of the other SAS cable to port A in the bottom canister of the
storage shelf.
4
Connect the other end of this cable to the right-hand port in the External RAID
PCIe card on the appliance.
See “Connecting the network cables” on page 47.
See “Connecting the power cords” on page 48.
Connecting a 4TB appliance to more than one
storage shelf
The steps in this section assume that the 4TB appliance and the storage shelves
are shipped together and installed at the same time.
You can add one or more storage shelves to an operational 4TB appliance. Refer
to one of the following Appendices for instructions.
■
Appendix A - Adding one or more storage shelves to an operating 4TB appliance
that does not have any storage shelves
■
Appendix B - Adding storage shelves to an operating 4TB appliance that has
at least one storage shelf attached
39
Installation procedures
Connecting a 4TB appliance to more than one storage shelf
Summary of Contents for NetBackup 5240
Page 4: ......
Page 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Page 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Page 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Page 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...